Jan 5, 2007
Michael Braukus/Beth Dickey Headquarters, Washington 202-358-1979/2087
Kim Newton Marshall Space Flight Center, Huntsville, Ala 256-544-0034
CONTRACT RELEASE: C07-002
NASA EXTENDS ARES I DEVELOPMENT CONTRACT
HUNTSVILLE, Ala - NASA has authorized a contract action having a value of $48 million with ATK Thiokol of Brigham City, Utah, to continue design and development of the first stage for the Ares I crew launch vehicle
Ares I will transport the Orion crew exploration vehicle and its crew of up to six astronauts, or other small cargo payloads, to low-Earth orbit The first stage will consist of a single reusable solid rocket booster and motor similar to those used on the space shuttle, but with a fifth motor segment added The upper stage will consist of a J-2X liquid hydrogen, liquid oxygen engine and the associated propellant tanks and fuel distribution systems
This Ares I first stage contract action will increase a first stage task under an existing shuttle contract by $48 million for a total work effort valued at $111 million These activities are a preparatory effort leading up to the Ares I first stage prime contract, which will be awarded in the February 2007 timeframe
The contract action maintains the design, development, test and evaluation schedule; expedites the procurement of new nozzle metal hardware and production tooling for propellant casting and nozzle fabrication; maintains the necessary design and engineering analysis; and continues participation in pilot parachute development tests The action also provides support for an initial test flight in the spring of 2009 known as Ares I-1 and provides support for Ares I-1 in preparation for Preliminary Design Review The test flight will use a simulated fifth segment on the first stage and a simulated upper stage
For more information about NASA's Constellation Program, visit:
http://www nasa gov/constellation
-end-
To subscribe to the list, send a message to: hqnews-subscribe@mediaservices nasa gov To remove your address from the list, send a message to: hqnews-unsubscribe@mediaservices nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: BULK_EMAIL
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]
If you're still having trouble, please contact the list owner at:
<mailto:list
admin@aus-city
com>
The following physical address is associated with this mailing list:
http://www aus-city com
This mailing list is announce-only.
NASA Reports list
Private list