There are 2 messages totalling 61 lines in this issue
Topics of the day:
Date: Sat, 15 May 2010 04:19:57 -0500 From: info@JSC NASA GOV Subject: STS-132 MCC Status Report #02
STS-132 Report #02 Saturday, May 15, 2010 - 4 a m CDT Mission Control Center, Houston, Texas
HOUSTON � Space shuttle Atlantis� crew of six are awake and ready to embark on their first full day in space for the mission Today, the crew will focus on a routine inspection of the orbiter and preparations for their docking to the International Space Station
The crew awoke at 3:20 a m CDT to �You�re My Home� performed by Billy Joel The song was played for Commander Ken Ham, who is on his second spaceflight
The main focus of the day will be the six-hour-long inspection of Atlantis� wing leading edges and nose cap Ham, Pilot Tony Antonelli and Mission Specialists Garrett Reisman and Piers Sellers will use the shuttle�s robotic arm and specialized cameras to downlink the detailed views of the thermal protection system for analysis by specialists on the ground
Meanwhile, Michael Good and Steve Bowen are scheduled to unpack and ready the spacesuits that will be used for the three planned spacewalks Later in the day, Bowen will join Reisman will perform a checkout of the tools needed for the rendezvous and docking to the station, which is planned for 9:27 a m Sunday
The Expedition 23 Commander Oleg Kotov and Russian Flight Engineers Alexander Skvortsov and Mikhail Kornienko, Flight Engineer Soichi Noguchi of the Japan Aerospace Exploration Agency, and NASA Flight Engineers T J Creamer and Tracy Caldwell Dyson are likewise making preparations for the arrival of the shuttle crew
As part of the Daily Planning Conference, the station crew was informed of a possible debris avoidance maneuver The team is still assessing if a maneuver will be required, but if so, they could implement it remotely during crew sleep Saturday evening A final decision is expected to be made by 4 p m If a maneuver is executed, it would be a 0 5 meter-per-second retrograde burn at 8:08 p m , and would not affect rendezvous with Atlantis on Sunday
The next shuttle status report will be issued after crew sleep or earlier if warranted
NASA Johnson Space Center Mission Status Reports and other information are available automatically by sending an Internet electronic mail message to listserv@listserver jsc nasa gov In the body of the message (not the subject line) users should type "subscribe hsfnews" (no quotes) This will add the e-mail address that sent the subscribe message to the news release distribution list The system will reply with a confirmation via e-mail of each subscription Once you have subscribed you will receive future news releases via e-mail
Date: Sat, 15 May 2010 16:51:01 -0500 From: info@JSC NASA GOV Subject: STS-132 MCC Status Report #03
STS-132 Report #03 4:50 p m CDT Saturday, May 15, 2010 Mission Control Center, Houston, Texas
HOUSTON � Atlantis astronauts checked out spacesuits and rendezvous tools in preparation for Sunday�s docking with the International Space Station, scheduled for 9:27 a m CDT They also did a modified thermal protection system inspection
The shuttle and its crew of six, Commander Ken Ham, Pilot Tony Antonelli and Mission Specialists Garrett Reisman, Michael Good, Steve Bowen and Piers Sellers are bringing six new 375-pound batteries to the station, along with the Russian Mini-Research Module and other equipment, supplies and experiments They will spend about seven days at the station Reisman, Bowen and Good will perform a total of three spacewalks
Good and Bowen spent several hours Saturday checking out spacesuits and preparing them for transfer to the station�s Quest airlock, where the spacewalks will originate Reisman, who spent much of his day working with Antonelli and Ham on the thermal protection system survey, did manage to spend some time helping with the suit and spacewalk equipment checkouts
Before the thermal protection checkout began, the crew encountered a problem with a cable snagging the pan-tilt unit on the end of the 50-foot orbiter boom sensor system It is the mount for senor package 1, the Laser Dynamic Range Imager and the intensified video camera
As a result, mission control decided to switch to sensor package 2, a laser camera and a digital camera mounted near the end of the boom That system, which requires daylight or another light source, has a resolution of a few millimeters and can scan at about 2 5 inches per second Its images of the right wing, the nose cap and much of the left wing were sent to the ground for detailed analysis Additional images will be available after the rendezvous pitch maneuver and from station assets The change is not expected to affect Sunday�s rendezvous and docking or otherwise impact the mission
Managers in mission control decided not to perform a debris avoidance maneuver that would have taken place Saturday a little after 8 p m Flight controllers had been carefully monitoring a piece of orbital debris that had threatened to come near the station Sunday, but updated tracking information showed the object will remain a safe distance away and the maneuver is not needed
The station crew, Commander Oleg Kotov and Russian Flight Engineers Alexander Skvortsov and Mikhail Kornienko, Soichi Noguchi of the Japan Aerospace Exploration Agency, and NASA Flight Engineers T J Creamer and Tracy Caldwell Dyson, are shifting their sleep schedule in preparation for welcoming Atlantis astronauts
The next shuttle status report will be issued after crew wakeup, scheduled for 2:20 a m , or earlier if warranted
NASA Johnson Space Center Mission Status Reports and other information are available automatically by sending an Internet electronic mail message to listserv@listserver jsc nasa gov In the body of the message (not the subject line) users should type "subscribe hsfnews" (no quotes) This will add the e-mail address that sent the subscribe message to the news release distribution list The system will reply with a confirmation via e-mail of each subscription Once you have subscribed you will receive future news releases via e-mail
End of HSFNEWS Digest - 15 May 2010 to 16 May 2010 (#2010-61)
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
https://aus-city com/cgi-bin/dada/mail cgi/u/NASA_REPORTS/example/example com/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
<[program_url]/list/[list]>
If you're still having trouble, please contact the list owner at:
<mailto:[list_owner_email]>
The following physical address is associated with this mailing list:
[physical_address]
This mailing list is announce-only.
NASA Reports list
Private list