HSFNEWS Digest - 17 Dec 2013 to 18 Dec 2013 (#2013-107)

 
From: "[NASA REPORTS]" <list.admin@aus-city.com>
Date: December 18th 2013

There is 1 message totalling 56 lines in this issue

Topics of the day:

  1. NASA Postpones Orbital Launch, Sets Spacewalks to Repair Faulty Station Pump Module

Date: Tue, 17 Dec 2013 16:13:09 -0600 From: info@JSC NASA GOV Subject: NASA Postpones Orbital Launch, Sets Spacewalks to Repair Faulty Station Pump Module

December 17, 2013

Josh Byerly Johnson Space Center, Houston 281-483-5111

Joshua Buck Headquarters, Washington 202-358-1100

Report #13-374

NASA Postpones Orbital Launch, Sets Spacewalks to Repair Faulty Station Pump Module

NASA managers are postponing the upcoming Orbital Sciences commercial cargo resupply mission to the International Space Station to proceed with a series of spacewalks to replace a faulty pump module on the space station

NASA Television will air a news briefing at 3 p m EST on Wednesday, Dec 18 to preview the spacewalks

Orbital Sciences' Cygnus spacecraft, atop its Antares rocket, now will launch no earlier than January The postponement of the Antares launch will allow ample time for the station crew to focus on repairing a faulty pump module that stopped working properly on Dec 11

NASA currently plans for two Expedition 38 astronauts to venture outside the space station Dec 21, 23 and 25 NASA astronauts Rick Mastracchio and Mike Hopkins will remove a pump module that has a failed valve They will replace it with an existing spare that is stored on an external stowage platform The pump is associated with one of the station's two external cooling loops, which circulate ammonia outside the station to keep both internal and external equipment cool Each of the three spacewalks will begin at 7:10 a m and is scheduled to last six and a half hours NASA TV coverage will begin at 6:15 a m

Wednesday's spacewalks preview briefing will take place from NASA's Johnson Space Center in Houston Reporters may attend the 3 p m briefing at Johnson and other participating NASA centers, or ask questions by calling the Johnson newsroom at 281-483-5111 no later than 2:45 p m Briefers will include:

-- Michael Suffredini, International Space Station program manager -- Dina Contella, International Space Station flight director -- Allison Bolinger, lead spacewalk officer

For NASA TV streaming video, schedule and downlink information, visit:

http://www nasa gov/nasatv

For video b-roll and other media resources for the space station, visit:

http://www nasa gov/stationnews

For more information about the International Space Station and its crew, visit:

http://www nasa gov/station

-end-

#

NASA Johnson Space Center Mission Status Reports and other information are available automatically by sending an Internet electronic mail message to listserv@listserver jsc nasa gov In the body of the message (not the subject line) users should type "subscribe hsfnews" (no quotes) This will add the e-mail address that sent the subscribe message to the news release distribution list The system will reply with a confirmation via e-mail of each subscription Once you have subscribed you will receive future news releases via e-mail To unsubscribe, send an e-mail to listserv@listserver jsc nasa gov with the following command in the body of your e-mail message: "unsubscribe hsfnews" (no quotes) or from another account, besides the account used to subscribe: "unsubscribe hsfnews youremail@yourdomain com" (no quotes)


End of HSFNEWS Digest - 17 Dec 2013 to 18 Dec 2013 (#2013-107)


Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

NASA Reports list

Privacy Policy:

Private list