Date: May 5th 2006

05 05 06

Joe Pally Headquarters, Washington (202) 358-7239

Jessica Rye Kennedy Space Center, Fla (321) 867-2468

STATUS REPORT: S-050506

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

NASA's space shuttle fleet is housed and processed at Kennedy Space Center, Fla

Mission: STS-121 - 18th International Space Station Flight (ULF1 1) - Multi-Purpose Logistics Module Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: Launch Processing Window July 1-19, 2006 Launch Pad: 39B Crew: Lindsey, Kelly, Sellers, Fossum, Nowak, Wilson and Reiter Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

Technicians continue final preparations on Discovery prior to its move to the Vehicle Assembly Building The move is scheduled for May 12 Shuttle program managers will discuss readiness for the move and any final technical details during the Orbiter Rollover Review on May 8

As a precautionary measure to provide protection from the tin whiskering phenomenon, a reaction jet driver was replaced in an avionics bay and successfully retested early this week Whiskering is a phenomenon identified decades ago whereby certain metals, primarily tin, zinc and cadmium, develop pure metallic crystalline extrusions

During retesting of the reaction jet driver replacement, an unrelated problem was discovered in the load control assembly in a line replacement unit box in the forward avionics bay The remotely controlled assembly provides power to the reaction jet driver Technicians have replaced the assembly and will retest the equipment over the weekend

Mission: STS-115 - 19th International Space Station Flight (12A) - P3/P4 Solar Arrays Vehicle: Atlantis (OV-104) Location: Orbiter Processing Facility Bay 1 Launch Date: No earlier than Aug 28, 2006 Launch Pad: 39B Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

Technicians are carrying out powered-up system testing on Atlantis for its mission to the station Workers continue to perform water coolant loop samples

The remote manipulator system, or shuttle robotic arm, is scheduled to be installed early next week The shuttle arm maneuvers a payload from the payload bay of the orbiter to its deployment position and then releases it The arm can also grapple a free-flying payload, maneuver it to the payload bay of the orbiter and berth it in the orbiter

Endeavour (OV-105)

Powered-up system testing continues on Endeavour in Orbiter Processing Facility Bay 2 following an extensive modification period Technicians continue completing system leak and functional checks on the liquid oxygen side of the main propulsion system

Heater checks for the multi-purpose logistics module are complete The logistics module will be added to the payload bay at the launch pad and will carry supplies and equipment to the station

External Tank

Following detailed discussions Thursday, Space Shuttle Program management decided that a tanking test of the external fuel tank will not be needed prior to Discovery's STS-121 mission Managers decided the proposed objectives of the test could be achieved during the actual launch attempt

Technicians continue to perform final closeouts on the external tank and solid rocket boosters in the Vehicle Assembly Building in preparation for Discovery to be attached to the tank and boosters, or as it's also known, the stack

For previous space shuttle processing status reports on the Web, visit:

http://www nasa gov/shuttle

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: BULK_EMAIL

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:listadmin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list