Date: April 21st 2007

04 20 07

Bill Johnson Kennedy Space Center, Fla 321-867-2468

STATUS REPORT: S-042007

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

Mission: STS-117 - 21st International Space Station Flight (13A) - S3/S4 Truss Segment Solar Arrays Vehicle: Atlantis (OV-104) Location: Vehicle Assembly Building Launch Date: Targeted for June 8, 2007 Launch Pad: 39A Crew: Sturckow, Archambault, Reilly, Swanson, Forrester and Olivas Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

In high bay No 1 of the Vehicle Assembly Building, technicians and engineers continue repairing foam on the hail-damaged STS-117 external fuel tank, ET-124 The poured foam repairs are nearly complete, and technicians are trimming and sanding repair sites Spray foam repairs are scheduled to begin next week Due to the amount of tank repair work remaining, the rollout of Atlantis to the launch pad is now scheduled for May 12 This six-day change should not affect the June 8 target launch date

Preparations are complete for the removal of Atlantis' three main engines to inspect for flow liner contamination Engine removal is scheduled to begin next week This work can be accomplished within the time frame of the tank repair

Mission: STS-118 - 22nd International Space Station Flight (13A 1) - S5 Truss Segment Vehicle: Endeavour (OV-105) Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for Aug 9, 2007 Launch Pad: 39A Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Anderson Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

Two of the three orbiter main engines have been inspected and reinstalled All three engines were removed last week to allow for flow liner contaminant inspections No RepliSet contamination was found in any of the flow liners The orbiter boom sensor system, which was removed for mechanical repairs on the boom pedestals, was reinstalled this week The system and the shuttle arm will be deployed today, and technicians will begin installing the sensor packs in the boom The nose landing gear wheel/tire assembly was installed this week, and the steering and brake tests are complete

ET-117, the external fuel tank to be used for STS-118, is scheduled to be transported from the barge in the turn basin to the Vehicle Assembly Building on April 30 The tank will then be lifted into a checkout cell in high bay No 2 West for processing

Mission: STS-120 - 23rd International Space Station Flight (10A) - U S Node 2 Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: Targeted for Oct 20, 2007 Launch Pad: 39A Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

In Orbiter Processing Facility bay No 3, water spray boiler system servicing and checkout continues Wire tray closeouts in the midbody are ongoing and cargo bay closeouts are under way The forward reaction control system will be delivered to the facility's bay No 3 today and installed next week Functional testing on all three fuel cells is complete Inspections of the main propulsion system flow liners are finished

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: example@example.com

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:list
admin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list