Date: May 5th 2007

05 04 07

George Diller Kennedy Space Center, Fla 321-867-2468

STATUS REPORT: S-050407

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

Mission: STS-117 - 21st International Space Station Flight (13A) - S3/S4 Truss Segment Solar Arrays Vehicle: Atlantis (OV-104) Location: Vehicle Assembly Building Launch Date: Targeted for June 8, 2007 Launch Pad: 39A Crew: Sturckow, Archambault, Reilly, Swanson, Forrester, Olivas and Anderson Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

In high bay No 1 of the Vehicle Assembly Building, technicians and engineers continue repairing foam on the hail-damaged STS-117 external fuel tank, ET-124 Spray foam repairs began this week, and an area on the "ogive pencil point" (at the top of the tank) is scheduled to undergo a spray foam repair this weekend

Atlantis' three main engines were removed this week for flow liner contamination inspections, which are now complete A small piece of RepliSet found in the engine No 2 flow liner has been removed The silicon rubber RepliSet is used in making 3-D impressions that help to detect cracks in the main propulsion system fuel line flow liners Engine No 3 has been reinstalled, and engineers are reinstalling engines No 1 and 2

Mission: STS-118 - 22nd International Space Station Flight (13A 1) - S5 Truss Segment Vehicle: Endeavour (OV-105) Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for Aug 9, 2007 Launch Pad: 39A Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

Workers in Orbiter Processing Facility bay 2 are installing the orbiter engine heat shields and have completed the engine interface connections Technicians are also working on modifications to the orbiter's engine cutoff sensor wiring This work involves rerouting new wires and installing new resisters The crew hatch carrier panel fit check was successfully completed this week Checkout of the orbiter's three inertial measurement units is complete These units are part of the orbiter's navigation system Nose landing gear door rigging continues, and orbiter aft closeout work began this week

ET-117, the external fuel tank to be used for STS-118, was transported Monday from the barge in the turn basin to the Vehicle Assembly Building The next day, the tank was lifted into a checkout cell in high bay No 2 for processing

Mission: STS-120 - 23rd International Space Station Flight (10A) - U S Node 2 Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: Targeted for Oct 20, 2007 Launch Pad: 39A Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

In Orbiter Processing Facility bay No 3, workers have completed verifying the forward reaction control system interface connections New, stronger tile known as BRI tile is being installed around the main landing gear doors and the external tank doors Checkout of the "station to shuttle power transfer system" is under way Technicians are also working on modifications to the orbiter's engine cutoff sensor wiring This work involves rerouting new wires and installing new resisters APU lube oil servicing is complete, and functional testing of the atmospheric revitalization pressure control system, part of the orbiter's life support system, is in progress

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: example@example.com

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:list
admin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list