Date: May 12th 2007

05 11 07

George Diller Kennedy Space Center, Fla 321-867-2468

STATUS REPORT: S-051107

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

Mission: STS-117 - 21st International Space Station Flight (13A) - S3/S4 Truss Segment Solar Arrays Vehicle: Atlantis (OV-104) Location: Vehicle Assembly Building Launch Date: Targeted for June 8, 2007 Launch Pad: 39A Crew: Sturckow, Archambault, Reilly, Swanson, Forrester, Olivas and Anderson Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

In high bay No 1 of the Vehicle Assembly Building, repairs to the foam on the hail-damaged external fuel tank ET-124 are nearly complete, and technicians and engineers are preparing Atlantis for its rollout to Launch Pad 39A, currently scheduled for May 16 Atlantis' three main engines, which were removed last week to allow for inspection of the flow liners, have all been reinstalled, and final checkout and testing are under way

Mission: STS-118 - 22nd International Space Station Flight (13A 1) - S5 Truss Segment Vehicle: Endeavour (OV-105) Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for Aug 9, 2007 Launch Pad: 39A Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

Members of the STS-118 crew are in Orbiter Processing Facility bay No 2 today and will be there Saturday for the crew equipment interface test The test provides an opportunity for the crew to review equipment in the crew cabin and cargo bay of the orbiter, and to review in-flight maintenance procedures

Earlier in the week, technicians installed the tunnel adapter, which is located in the midbody between the external airlock and a container used to transport experiments and cargo Completion of the installation signifies closeout of the orbiter's midbody Technicians continued work this week on modifications to the orbiter's engine cutoff sensor wiring Work also continues on closeout of the orbiter maneuvering system and the orbiter aft

Mission: STS-120 - 23rd International Space Station Flight (10A) - U S Node 2 Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: Targeted for Oct 20, 2007 Launch Pad: 39A Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

In Orbiter Processing Facility bay No 3, workers continue modifications to the orbiter's engine cutoff sensor wiring Functional testing of the atmospheric revitalization pressure control system, part of the orbiter's life support system, is under way Workers are also preparing for servicing of the ammonia boiler, which is a heat exchanger that helps cool the hydraulic system

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: example@example.com

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:list
admin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list