April 25, 2008
George H Diller Kennedy Space Center, Fla 321-867-2468 george h diller@nasa gov
STATUS REPORT: ELV-042508
EXPENDABLE LAUNCH VEHICLE STATUS REPORT
Mission: GLAST (Gamma-ray Large Area Space Telescope) Location: Astrotech payload processing facility Launch Vehicle: Delta II 7920-H Launch Pad: 17-B Launch Date: TBD (under assessment) Launch Window: 11:45 a m - 1:40 p m EDT
At Pad 17-B on Cape Canaveral Air Force Station, the Delta II second stage was hoisted into position on Tuesday Upcoming milestones include a cryogenic test of the first stage using liquid oxygen, along with an associated countdown operation A Simulated Flight Test follows that, encompassing the flight events that occur from liftoff through spacecraft separation to exercise the onboard vehicle systems of the Delta II Both tests will occur approximately the second week of May
Meanwhile, at the Astrotech payload processing facility, end-to-end communications testing through the Tracking and Data Relay Satellite System has been completed Three sunshades associated with the star tracker system were installed on Wednesday, and the sun trackers associated with the solar arrays were cleaned The closeouts of the spacecraft thermal blankets continue A final cleaning of the overall spacecraft and black light inspection are under way today, which are the last activities for spacecraft processing until the fueling of the spacecraft Fueling will be scheduled once a launch date has been determined
Previous status reports are available on the Web at:
http://www nasa gov/centers/kennedy/launchingrockets/status/2008
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]
If you're still having trouble, please contact the list owner at:
<mailto:list
admin@aus-city
com>
The following physical address is associated with this mailing list:
http://www aus-city com
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list