May 30, 2008
George H Diller Kennedy Space Center, Fla 321-867-2468 george h diller@nasa gov
STATUS REPORT: ELV-053008
EXPENDABLE LAUNCH VEHICLE STATUS REPORT
Mission: GLAST (Gamma-ray Large Area Space Telescope) Launch Vehicle: Delta II 7920-H (United Launch Alliance) Launch Pad: 17-B Launch Date: June 5, 2008 Launch Window: 11:45 a m - 1:40 p m EDT
The launch of NASA's GLAST spacecraft aboard a United Launch Alliance Delta II rocket is being scheduled for Thursday, June 5, instead of no earlier than June 3 The launch window extends from 11:45 a m to 1:40 p m EDT and remains unchanged through Aug 7
The June 5 date is already reserved for the launch of GLAST on the Eastern Range The decision was made at the conclusion of Thursday's Flight Readiness Review to give the launch team sufficient time to determine that remaining open engineering issues are resolved
Loading of the hypergolic propellants into the Delta II second stage is scheduled for Monday, June 2 On launch day, June 5, the mobile service tower will be retracted from around the rocket at 2 a m Loading of the liquid oxygen to begin the final phase of the launch countdown will begin at 10 a m which will lead to a liftoff targeted for 11:45 a m EDT
Mission: OSTM/Jason-2 Location: Astrotech payload processing facility, Vandenberg Air Force Base Launch Vehicle: Delta II 7320 (United Launch Alliance) Launch Pad: Space Launch Complex 2, Vandenberg Air Force Base Launch Date: June 15, 2008 Launch Window: 1:47 - 1:56 a m PDT
At the Astrotech payload processing facility on north Vandenberg, the spacecraft has been mated to the Delta II payload attach fitting, and spacecraft closeouts have been completed On Sunday, June 1, OSTM/Jason-2 will be installed into the payload transportation canister The following day, June 2, it will be moved to Space Launch Complex 2 to be mated with the Delta II rocket
The Flight Program Verification, an integrated test of both the Delta II and the OSTM/Jason-2 spacecraft, will be conducted on June 5 This is the last major test before launch The payload fairing will be installed around the spacecraft on June 9 The Delta II second stage hypergolic propellants will be loaded into the vehicle on June 12
Previous status reports are available at:
http://www nasa gov/centers/kennedy/launchingrockets/status/2008
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]
If you're still having trouble, please contact the list owner at:
<mailto:list
admin@aus-city
com>
The following physical address is associated with this mailing list:
http://www aus-city com
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list