STATUS REPORT: ELV-010609
EXPENDABLE LAUNCH VEHICLE STATUS REPORT
Mission: NOAA-N Prime Launch Vehicle: Delta II 7320 Launch Pad: Space Launch Complex 2, Vandenberg Air Force Base, Calif Launch Date: February 4, 2009 Launch Window: 2:22:01 - 2:32:01 a m PST
Testing has been successfully completed on the solar array harness Though no fault indications in the harness were found, two wires were disconnected to remove a possible "sneak circuit" electrical path The spacecraft electrical connections have been returned to flight configuration A solar array illumination test is planned for today Preparations will begin next week to prepare the spacecraft for transportation to Space Launch Complex 2 and attachment to the Delta II rocket
Stacking of the Delta II rocket at Space Launch Complex 2 is complete, and the mechanical checkout and electrical testing are under way Avionics system checkout is scheduled for Jan 7, a liquid oxygen tanking test and countdown demonstration are planned for Jan 8, and a simulated flight test of launch vehicle in-flight events will follow on Jan 9
Mission: Orbiting Carbon Observatory (OCO) Launch Vehicle: Taurus XL (Orbital Sciences) Launch Pad: Space Launch Complex 576-E, Vandenberg AFB Launch Date: February 23, 2009 Launch Time: 1:50:29 a m PST
The work to prepare the OCO spacecraft for launch will resume with preparations for fueling, currently planned for Saturday Fueling the spacecraft will then be performed next week A spacecraft limited performance test will follow The operation to install the payload fairing around the spacecraft is scheduled to begin Feb 9
Testing and prelaunch preparations continue on the Taurus launch vehicle by Orbital Sciences in Hangar 1555 on north Vandenberg A launch vehicle verification test will be performed on Jan 12 with a flight simulation planned for Jan 15
Mission: Kepler Launch Vehicle: Delta II 7925 Launch Pad: 17-B, Cape Canaveral Air Force Station Launch Date: March 5, 2009 Launch Time: 10:48 p m EDT
Kepler arrived at the Astrotech payload processing facility near Kennedy Space Center this afternoon Work is under way to remove the spacecraft from the shipping container Initial testing will begin on Friday
Launch preparations for the Delta II rocket continue on schedule at Pad 17-B Loading the first stage with liquid oxygen as a leak check and to serve as a countdown demonstration and certification for the launch team is scheduled for Jan 19 A flight simulation which exercises the electrical and mechanical systems of the rocket as they will operate after liftoff during flight will be conducted on Jan 20
Leak checks of the first stage fuel system are complete, and the checkout of the guidance and vehicle control system was finished before the holidays, as planned
Previous status reports are available at:
http://www nasa gov/centers/kennedy/launchingrockets/status/index html
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/plugins/dada_bridge pl/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
<[program_url]/list/[list]>
If you're still having trouble, please contact the list owner at:
<mailto:[list_owner_email]>
The following physical address is associated with this mailing list:
[physical_address]
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list