Mission: Space Tracking and Surveillance System - Demonstrators Program (STSS-Demo) Launch Vehicle: Delta II 7920-10 Launch Pad: Launch Pad 17 B, Cape Canaveral Air Force Station, Fla Launch Date: Sept 15, 2009 Launch Window: 8:43 - 9:43 p m EDT
At Pad B on Launch Complex 17, liquid oxygen leak checks of the first stage are scheduled next week on July 20 For this test, the first stage will be filled with liquid oxygen during a simulated countdown
At the pad the following day, July 21, a simulated flight test will be conducted This is an electrical and mechanical test of the Delta II that exercises all of the launch vehicle systems in the same manner as will occur during powered flight
Mission: Solar Dynamics Observatory (SDO) Launch Vehicle: Atlas V-401 Launch Pad: Launch Complex 41, Cape Canaveral Air Force Station, Fla Launch Timeframe: November
The SDO spacecraft arrived at the Astrotech Space Operations payload processing facility near the Kennedy Space Center in late afternoon July 9 In the airlock the following day, the lid of the shipping container was removed On July 11, the spacecraft was rotated from the horizontal to vertical configuration and hoisted onto a work dolly It was then moved from the airlock into the clean room On July 13, the protective wrapping was removed from around SDO to begin the spacecraft processing
The high-gain communications antenna was lowered to horizontal on July 15, providing access to the spacecraft's battery compartment The flight battery was installed later that day and electrical connections are now under way
Previous status reports are available at:
http://www nasa gov/centers/kennedy/launchingrockets/status/index html
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
<[program_url]/list/[list]>
If you're still having trouble, please contact the list owner at:
<mailto:[list_owner_email]>
The following physical address is associated with this mailing list:
[physical_address]
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list