Oct 9, 2009
George H Diller Kennedy Space Center, Fla 321-867-2468 george h diller@nasa gov
STATUS REPORT: ELV-100909
EXPENDABLE LAUNCH VEHICLE STATUS REPORT
Spacecraft: Wide-field Infrared Survey Explorer (WISE) Launch Vehicle: Delta II 7320 Launch Pad: SLC-2, Vandenberg Air Force Base, Calif Launch Date: Dec 7, 2009 Launch Window: 6:10 - 6:23 a m PST
At the Astrotech payload processing facility on north Vandenberg, WISE spacecraft testing is complete Work now is beginning to prepare the spacecraft for loading of the cryogenic hydrogen which will be used to supercool the infrared telescope during its six months of observations
Build-up of the Delta II rocket at Space Launch Complex 2 is scheduled to begin on Oct 16 with hoisting of the first stage into the launcher
Spacecraft: Solar Dynamics Observatory (SDO) Launch Vehicle: Atlas V-401 Launch Pad: Launch Complex 41, Cape Canaveral Air Force Station, Fla Launch Date: Feb 3, 2010 Launch Window: 10:53 - 11:53 a m EST
Propulsion system testing and leak checks of the spacecraft are under way The full observatory comprehensive performance test is complete
The Atlas rocket first stage booster is set to arrive by air at Cape Canaveral Air Force Station on Oct 26, followed by the Centaur upper stage on Oct 29
Previous status reports are available at:
http://www nasa gov/centers/kennedy/launchingrockets/status/index html
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
<[program_url]/list/[list]>
If you're still having trouble, please contact the list owner at:
<mailto:[list_owner_email]>
The following physical address is associated with this mailing list:
[physical_address]
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list