07 07 06
Tracy Young Kennedy Space Center, Fla 321-867-2468
STATUS REPORT: S-070706
NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT
Note: NASA's Kennedy Space Center issues Space Shuttle Processing
Status Reports periodically and is the source for information
regarding processing activities associated with the vehicles and
payloads
This report does not necessarily reflect the chronological
order of future space shuttle missions
If you are a member of the
media and would like further information, visit:
http://www
nasa
gov/centers/kennedy/news/index
html
Mission: STS-121 - 18th International Space Station Flight (ULF1 1) - Multi-Purpose Logistics Module Vehicle: Discovery (OV-103) Official Launch Date: July 4, 2006 at 2:38 p m Expected KSC Landing Date/Time: July 17 at about 9:14 a m Crew: Lindsey, Kelly, Sellers, Fossum, Nowak, Wilson and Reiter Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
Today is Flight Day 4 for STS-121, and Discovery is currently docked to the International Space Station The Multi-Purpose Logistics Module containing supplies and equipment for the space station has been transferred from Discovery's payload bay to its station port The crew will spend the next several days unloading the module and then filling it with items to be returned to Earth
Mission: STS-115 - 19th International Space Station Flight (12A) - P3/P4 Solar Arrays Vehicle: Atlantis (OV-104) Location: Orbiter Processing Facility Bay 1 Launch Date: No earlier than Aug 28, 2006 Launch Pad: 39B Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility bay 1, workers are busy preparing Atlantis for rollover to the Vehicle Assembly Building, currently scheduled for the last week of July Final gap filler and tile work is under way, and final inspections of the radiator are complete
The payload bay doors are scheduled to be closed for flight late today Workers have configured the shuttle main engines for rollover and are finishing final closeouts in the forward and aft sections
In high bay 3 of the Vehicle Assembly Building, ET-118, the external fuel tank for STS-115, has been lifted from the checkout cell, and operations to mate it to the solid rocket boosters are under way
Endeavour (OV-105)
Powered-up system testing continues on Endeavour in Orbiter Processing Facility bay 2 following an extensive modification period This week, functional testing of the atmosphere revitalization pressure control system got under way This system maintains crew module pressure during flight Window no 3 installation is nearing completion, and tile-processing work continues around the external tank doors and nose landing gear doors Gap filler removal and replacement continues in the high priority areas of the orbiter's heat shield
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: BULK_EMAIL
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]
If you're still having trouble, please contact the list owner at:
<mailto:listadmin@aus-city
com>
The following physical address is associated with this mailing list:
http://www aus-city com
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list