Date: July 15th 2006

07 14 06

Tracy Young Kennedy Space Center, Fla 321-867-2468

STATUS REPORT: S-071406

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads This report does not necessarily reflect the chronological order of future space shuttle missions If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

Mission: STS-121 - 18th International Space Station Flight (ULF1 1) - Multi-Purpose Logistics Module Vehicle: Discovery (OV-103) Official Launch Date/Time: July 4, 2006 at 2:38 p m Expected KSC Landing Date/Time: July 17 at about 9:07 a m Crew: Lindsey, Kelly, Sellers, Fossum, Nowak, Wilson and Reiter Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

Today is flight day 11 for STS-121 Discovery is docked to the International Space Station The multi-purpose logistics module containing supplies and equipment for the space station has been unloaded and transferred from its station port back to Discovery's payload bay as the crew prepares for undocking The crew will also conduct an imagery survey of the orbiter's left wing Discovery is scheduled to undock from the station early Saturday morning

Mission: STS-115 - 19th International Space Station Flight (12A) - P3/P4 Solar Arrays Vehicle: Atlantis (OV-104) Location: Orbiter Processing Facility Bay 1 Launch Date: No earlier than Aug 28, 2006 Launch Pad: 39B Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

In Orbiter Processing Facility bay 1, workers are busy preparing Atlantis for rollover to the Vehicle Assembly Building, currently scheduled for the last week of July Final gap filler and tile work is under way The payload bay doors are closed for flight The orbiter main engine and maneuvering systems are configured for rollover Close-out work in the forward section of the orbiter continues On Monday, Atlantis will be powered down for rollover

In high bay 3 of the Vehicle Assembly Building, close-out work is under way to mate the solid rocket boosters to ET-118, the external fuel tank for STS-115

Endeavour (OV-105)

Powered-up system testing continues on Endeavour in Orbiter Processing Facility bay 2 following an extensive modification period Functional testing of the atmosphere revitalization pressure control system is under way This system maintains crew module pressure during flight Tile processing work continues around the external tank doors and nose landing gear doors Gap filler removal and replacement continues in the high priority areas of the orbiter's heat shield Helium system leak and functional tests of the main propulsion system are under way Workers are installing the star trackers in Endeavour's payload bay; these are deployed during flight for guidance and navigation All reinforced carbon-carbon panels have been installed on both wing leading edges

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: BULK_EMAIL

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:listadmin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list