Date: July 18th 2006

07 17 06

Tracy Young Kennedy Space Center, Fla 321-867-2468

STATUS REPORT: S-071706

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads This report does not necessarily reflect the chronological order of future space shuttle missions If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

Mission: STS-121 - 18th International Space Station Flight (ULF1 1) - Multi-Purpose Logistics Module Vehicle: Discovery (OV-103) Official Launch Date: July 4, 2006 at 2:38 p m Official Landing Date: July 17, 2006 at 9:14 a m Crew: Lindsey, Kelly, Sellers, Fossum, Nowak, Wilson and Reiter Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

After 12 days, 18 hours and 37 minutes of flight, orbiter Discovery safely landed at Kennedy Space Center today with a main landing gear touchdown at 9:14:43 a m EDT The nose landing gear touched down at 9:14:53 a m The orbiter came to a full stop at 9:15:49 a m Discovery made 202 trips around the Earth and traveled 5 3 million miles during the mission Following a four-hour period of landing operations at the shuttle landing strip, the orbiter systems were safed and technicians connected Discovery to ground support equipment for ground cooling and purging of the interior spaces Preliminary inspections revealed 93 total hits to the orbiter's thermal protection system with 11 greater than one inch in diameter The vehicle was towed to Orbiter Processing Facility bay 3, where the processing flow will begin for its next mission, STS-116, targeted for launch in December

Mission: STS-115 - 19th International Space Station Flight (12A) - P3/P4 Solar Arrays Vehicle: Atlantis (OV-104) Location: Orbiter Processing Facility Bay 1 Launch Date: No earlier than Aug 28, 2006 Launch Pad: 39B Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

In Orbiter Processing Facility bay 1, workers are making final preparations for the rollover of Atlantis to the Vehicle Assembly Building, currently scheduled for July 25 Forward closeouts continue and T-0 umbilical disconnects are scheduled to be completed today The T-0 umbilical is the connection point for ground power to the orbiter Final orbiter "power down" for rollover is scheduled for today Final tire pressure for flight is under way Procedures this week include orbiter jackdown, weight and center-of-gravity operations, which occur prior to the vehicle's transfer to the transporter Atlantis will be placed on its transporter on Wednesday

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: BULK_EMAIL

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:listadmin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list