Date: August 19th 2006

08 18 06

Tracy Young Kennedy Space Center, Fla 321-867-2468

STATUS REPORT: S-081806

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads This report does not necessarily reflect the chronological order of future space shuttle missions If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

Mission: STS-115 - 19th International Space Station Flight (12A) - P3/P4 Truss Segment and Solar Arrays Vehicle: Atlantis (OV-104) Location: Launch Pad 39B Launch Date: Aug 27, 2006, 4:30 p m EDT Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

At Launch Pad 39B, hypergolic propellant loading is being completed today Following a decision by Space Shuttle Program managers to remove and replace two Ku-band antenna actuator bolts in the forward section of the orbiter payload bay, workers are preparing access platforms and will complete the task over the weekend The bolts will be replaced with longer versions to ensure adequate thread engagement Ordnance installation is now scheduled for Sunday evening, pending completion of the bolt replacement

Earlier this week, flight crew systems workers installed extravehicular maneuvering units in the crew cabin The suits are worn by shuttle crew members for spacewalks

In Houston, the STS-115 crew is completing its final prelaunch physicals and a final flight data file review today, before heading into quarantine this weekend for the Aug 27 launch

Mission: STS-116 - 20th International Space Station Flight (12A 1) - P5 Truss Segment Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: No earlier than Dec 14, 2006 Launch Pad: 39B Crew: Polansky, Oefelein, Curbeam, Higginbotham, Patrick, Fuglesang and Williams Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

Processing of Discovery for its next mission, STS-116, continues in Orbiter Processing Facility bay 3 Window No 7 was installed this week The orbiter docking mechanism has been stowed for flight Engineers determined this week that auxiliary power unit No 3, which experienced a thermostat malfunction during STS-121, has an electrical short, and the unit will be replaced X-rays of the main propulsion system check valves are complete, and preparations for the replacement of orbital maneuvering system thruster L5L are under way

Endeavour (OV-105)

Powered-up system testing continues on Endeavour in Orbiter Processing Facility bay 2 following an extensive modification period Leak checks of Freon coolant loop No 2 are nearing completion Workers continue to install wire harnesses on the remote manipulator system (shuttle arm) pedestals Rigging of the pedestals is complete, and installation of the arm is scheduled for early September The orbiter's point sensor box was installed On the flight deck, functional testing of the pilot and commander seats was successfully completed

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: BULK_EMAIL

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:list
admin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list