Date: August 22nd 2006

08 21 06

Tracy Young Kennedy Space Center, Fla 321-867-2468

STATUS REPORT: S-082106

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads This report does not necessarily reflect the chronological order of future space shuttle missions If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

Mission: STS-115 - 19th International Space Station Flight (12A) - P3/P4 Truss Segment and Solar Arrays Vehicle: Atlantis (OV-104) Location: Launch Pad 39B Launch Date: Aug 27, 2006, 4:30 p m EDT Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

At Launch Pad 39B, workers have completed hypergolic propellant loading of the orbiter and solid rocket boosters Following a decision by Space Shuttle Program managers to remove and replace two Ku-band antenna actuator bolts in the forward section of the orbiter payload bay, workers spent the weekend preparing access platforms, performing the bolt replacement and then removing the temporary access equipment The bolt replacement was completed early Sunday Later on Sunday, the orbiter's payload bay doors were closed and ordnance installation was initiated, with completion early on Monday Technicians are now closing out the orbiter's aft compartments and pressurization of the orbiter's maneuvering system, reaction control system and main propulsion system will begin tomorrow Stowage of flight crew equipment in the crew module is ongoing

In Houston, the STS-115 crew began their health stabilization period in preparation for the Aug 27 launch

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: BULK_EMAIL

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:list
admin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list