Date: August 24th 2006

08 23 06

Tracy Young Kennedy Space Center, Fla 321-867-2468

STATUS REPORT: S-082306

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads This report does not necessarily reflect the chronological order of future space shuttle missions If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

Mission: STS-115 - 19th International Space Station Flight (12A) - P3/P4 Truss Segment and Solar Arrays Vehicle: Atlantis (OV-104) Location: Launch Pad 39B Launch Date: Aug 27, 2006, 4:30 p m EDT Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

At Launch Pad 39B, closeout of the orbiter's aft compartments continues, with aft door installation expected later today Once the doors are installed, workers will begin aft confidence testing This involves powering up and testing all of the aft systems, such as the main propulsion system circuits Pressurization of the orbiter's maneuvering system, the reaction control system and the main propulsion system has been completed Stowage of flight crew equipment in the crew module is ongoing, and the crew cabin and White Room are being prepared for launch Technicians will open the payload bay doors today to allow for the charging of the payload batteries The payload bay doors will be closed for flight on Thursday Final closeouts on the solid rocket boosters and the external fuel tank will be completed today

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: BULK_EMAIL

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:list
admin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list