Date: November 3rd 2006

11 02 06

Jessica Rye Kennedy Space Center, Fla 321-867-2468

STATUS REPORT: S-110206

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

During a scheduled Space Shuttle Program meeting today, managers ratified the target launch dates for the first three missions in 2007 New dates are as follows:

STS-117 aboard Atlantis March 16 STS-118 aboard Endeavour June 28 STS-120 aboard Atlantis Sept 7

Mission: STS-116 - 20th International Space Station Flight (12A 1) - P5 Truss Segment Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: No earlier than Dec 7, 2006 Launch Pad: 39B Crew: Polansky, Oefelein, Curbeam, Higginbotham, Patrick, Fuglesang and Williams Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

On Tuesday, drivers moved Space Shuttle Discovery atop the 76-wheeled orbiter transporter system from the Orbiter Processing Facility to the Vehicle Assembly Building Discovery's first motion out of the processing facility took place at 9:23 p m

Once in the assembly building, technicians began attaching Discovery to its propulsion elements: an external fuel tank, designated ET-123, and twin solid rocket boosters The hard mate, the permanent connect of the vehicle to the tank, was completed this morning Following those operations, technicians began final integration, preparations and closeouts for flight

Discovery's next milestone is the 4 2-mile trip to Launch Pad 39B The rollout of the shuttle to the launch pad is scheduled for Nov 7, with first motion of the vehicle out of the assembly building targeted for 7 a m

-end-

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: BULK_EMAIL

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:list
admin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list