Date: November 18th 2006

11 17 06

Jessica Rye Kennedy Space Center, Fla 321-867-2468

STATUS REPORT: S-111706

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

Mission: STS-116 - 20th International Space Station Flight (12A 1) - P5 Truss Segment Vehicle: Discovery (OV-103) Location: Launch Pad 39B Launch Date: No earlier than Dec 7, 2006 Launch Pad: 39B Crew: Polansky, Oefelein, Curbeam, Higginbotham, Patrick, Fuglesang and Williams Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

Following Space Shuttle Discovery's arrival at Launch Pad 39B on Nov 9, technicians began final preparations for the STS-116 launch to the International Space Station set for no earlier than Dec 7 At the pad, the payload was installed into the payload bay on Nov 11, and the payload/orbiter interface test was completed this week On Thursday, the remote manipulator system and orbiter boom sensor system were stowed and the payload bay doors were closed for flight late that night

This week, the seven-member crew of STS-116 took part in the terminal countdown demonstration test activities at Kennedy Space Center The astronauts arrived on Monday and returned to Johnson Space Center in Houston on Thursday afternoon On Tuesday and Wednesday, the crew practiced driving in the M113 armored personnel carrier, and participated in fire suppression training and flight crew equipment fit checks The crew also had the opportunity to go to the pad for the emergency egress and payload bay "walkdowns " On Thursday, the astronauts donned their launch and entry suits and entered the vehicle for a simulated countdown

Today, technicians are beginning preparations for the prelaunch propellant servicing scheduled to begin this weekend This process includes loading the fuel (monomethyl hydrazine) and oxidizer (nitrogen tetroxide) into the orbiter maneuvering system and the forward reaction control system It also includes the loading of hydrazine in the auxiliary power units on the orbiter and the solid rocket boosters

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: BULK_EMAIL

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:list
admin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list