07 13 07
George Diller Kennedy Space Center, Fla 321-867-2468
STATUS REPORT: S-071307
NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT
Note: NASA's Kennedy Space Center issues Space Shuttle Processing
Status Reports periodically and is the source for information
regarding processing activities associated with the vehicles and
payloads
If you are a member of the media and would like further
information, visit:
http://www
nasa
gov/centers/kennedy/news/index
html
Mission: STS-118 - 22nd International Space Station Flight - S5 Truss Segment Vehicle: Endeavour (OV-105) Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for Aug 7, 2007 Launch Pad: 39A Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
Shortly after 8 p m Monday, Endeavour rolled out of the Vehicle Assembly Building, arriving at Launch Pad 39A about seven hours later Connection of the shuttle and mobile launch platform systems to the pad systems immediately began, and validation of the systems is complete A test firing of the auxiliary power units on the orbiter showed that they operated normally Following this hot fire test, the rotating service structure was moved into the mate position, wrapping around the orbiter to provide weather protection and access for workers Checkouts of the shuttle systems are under way The hydraulic main engine and aerosurface frequency response test is complete
The orbiter payload bay doors will be opened tonight, with payload installation scheduled for Sunday
Mission: STS-120 - 23rd International Space Station Flight - U S Node 2 Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: Targeted for Oct 20, 2007 Launch Pad: 39A Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility bay No 3, checkout of the flash evaporator system heater is complete Testing of the engine cutoff sensor system, payload pre-mate testing and rigging of the latching mechanism for the orbiter boom sensor system are all under way Workers are preparing the orbiter for installation of two of the three engines, scheduled for this weekend
Stacking of the STS-120 solid rocket boosters in the Vehicle Assembly Building is scheduled to begin next week
Mission: STS-122 - 24th International Space Station Flight - Columbus Laboratory Module Vehicle: Atlantis (OV-104) Location: Orbiter Processing Facility Bay 1 Launch Date: Targeted for Dec 6, 2007 Launch Pad: 39A Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin and Walheim Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility bay No 1, overall inspection of the orbiter's thermal protection system is about 80 percent complete This includes thermography inspection of the left and right wing reinforced carbon-carbon panels, along with the chin panel and nose cap The main landing gear tires have been removed, the strongbacks were installed on the payload bay doors, and the doors have been opened The forward reaction control system thruster and vernier inspection began this week, as did removal of the main engine dome heat shields Preparations for engine removal are under way
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]
If you're still having trouble, please contact the list owner at:
<mailto:list
admin@aus-city
com>
The following physical address is associated with this mailing list:
http://www aus-city com
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list