Mission: STS-118 - 22nd International Space Station Flight - S5 Truss Segment Vehicle: Endeavour (OV-105) Location: Launch Pad 39A Launch Date: Aug 7, 2007 Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
At Launch Pad 39A, preparations continue for the launch of Endeavour on STS-118 The payload bay doors have been closed for flight Functional testing of the extravehicular mobility units (spacesuits) is complete The shuttle ordnance connections have been made Orbiter aft closeout work continues Engineers are working to resolve an abnormal leak rate in the orbiter crew cabin The problem has been traced to one of two positive pressure-relief valves which ensure that the crew cabin does not become over-pressurized A plan has been approved to remove and replace the suspect valve using a valve from Atlantis This work will begin tonight and be completed on Thursday
After further analysis of data, engineers have determined that it will not be necessary to remove and replace thermostats on APU No 1 The thermostat data characteristic, while not customary, is not in violation of specifications and is understood by engineers Therefore, this will not require further action prior to the STS-118 mission
Technicians have installed the thermal curtains on the aft skirts of the solid rocket boosters
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]
If you're still having trouble, please contact the list owner at:
<mailto:list
admin@aus-city
com>
The following physical address is associated with this mailing list:
http://www aus-city com
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list