STATUS REPORT: S-081707
NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT
Note: NASA's Kennedy Space Center issues Space Shuttle Processing
Status Reports periodically and is the source for information
regarding processing activities associated with the vehicles and
payloads
If you are a member of the media and would like further
information, visit:
http://www
nasa
gov/centers/kennedy/news/index
html
Mission: STS-118 - 22nd International Space Station Flight - S5 Truss Segment Vehicle: Endeavour (OV-105) Official Launch Date: Aug 8, 2007 Expected KSC Landing Date: Aug 22, 2007 Crew: Kelly, Hobaugh, Williams, Morgan, Mastracchio, Caldwell and Drew Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
Today is flight day 10 for STS-118 After extensive engineering analyses and testing, the Mission Management Team decided Thursday evening that damaged tile on the underbelly of the orbiter does not pose a threat to the crew or the vehicle, and no repair will be made During the week, the crew conducted three successful spacewalks During these excursions outside the International Space Station, crew members installed the Starboard 5 truss element, removed and replaced control moment gyroscope 3 on the Z1 truss, relocated several pieces of hardware outside the station to make way for the arrival of future station components, and retrieved experiments On Tuesday, the crew worked from inside the station, using the robotic arms on the shuttle and the station to unberth external stowage platform 3 from Endeavour's payload bay and install it on the P3 truss On Saturday, a fourth spacewalk will take place, during which two experiment containers located outside the station will be retrieved, two antennae will be installed and several other tasks will be completed
Mission: STS-120 - 23rd International Space Station Flight - U S Node 2 Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: Targeted for Oct 23, 2007 Launch Pad: 39A Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility bay No 3 this week, forward, midbody and aft closeout work continues The auxiliary power unit tank pressurization is complete Freon coolant loop No 1 and 2 top-off and sampling is finished Technicians performed hydraulic operations to position the shuttle main engines for rollover Testing of the orbital maneuvering system flight controls and gimbal system was successful Functional testing of the radiators, located on the payload bay doors, is under way
Stacking of the STS-120 solid rocket boosters in the Vehicle Assembly Building is complete and closeout work is under way
Mission: STS-122 - 24th International Space Station Flight - Columbus Module Vehicle: Atlantis (OV-104) Location: Orbiter Processing Facility Bay 1 Launch Date: Targeted for Dec 6, 2007 Launch Pad: 39A Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin and Walheim Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility bay No 1, work began this week on modifications to the orbiter's engine cutoff sensor wiring, which involves rerouting new wires and installing new resistors Workers also continued installing new, stronger tiles, known as BRI tiles, around the main landing gear doors Installation of the main propulsion system tanks is under way Removal of the left-hand orbital maneuvering system pod to allow for a valve replacement is scheduled for later today
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]
If you're still having trouble, please contact the list owner at:
<mailto:list
admin@aus-city
com>
The following physical address is associated with this mailing list:
http://www aus-city com
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list