George Diller Kennedy Space Center, Fla 321-867-2468 george h diller@nasa gov
STATUS REPORT: S-090707
NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT
Note: NASA's Kennedy Space Center issues Space Shuttle Processing
Status Reports periodically and is the source for information
regarding processing activities associated with the vehicles and
payloads
If you are a member of the media and would like further
information, visit:
http://www
nasa
gov/centers/kennedy/news/index
html
Mission: STS-120 - 23rd International Space Station Flight - U S Node 2 Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: Targeted for Oct 23, 2007 Launch Pad: 39A Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility bay No 3, forward and aft closeout work continues Work is under way to test for orbiter structural leakage and positive pressure Final orbiter power down is scheduled for next week
In the Vehicle Assembly Building, external tank No 120 was transferred on Wednesday from its checkout cell to high bay No 1 for mating to the solid rocket boosters Closeout work is now under way, including mechanical and electrical connections of the tank and boosters
Mission: STS-122 - 24th International Space Station Flight - Columbus Module Vehicle: Atlantis (OV-104) Location: Orbiter Processing Facility Bay 1 Launch Date: Targeted for Dec 6, 2007 Launch Pad: 39A Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin and Walheim Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility bay No 1, modifications are finished on the orbiter's engine cutoff sensor wiring This involved rerouting new wires and installing new resistors Orbiter power system validation is complete Technicians finished waterproofing the orbiter's thermal protection system last weekend Checkout and verification of the orbiter's remote manipulator system, also known as the shuttle arm, is under way
Mission: STS-123 - 25th International Space Station Flight - Kibo Logistics Module, Dextre Robotics System Vehicle: Endeavour (OV-105) Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for Feb 14, 2008 Launch Pad: 39A Crew: Gorie, Johnson, Linnehan, Doi, Behnken, Foreman and Reisman Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility bay No 2, deservicing of the hypergolic fuel system is complete Functional testing of the forward reaction control system is finished, as well as post-flight thermography inspections of the right and left wing leading edges The engine dome heat shields have been removed and preparations are under way for removal of the three shuttle main engines next week Technicians are preparing for the functional checkout of the left and right orbital maneuvering system pods, scheduled for next week They are also removing the STS-118 payload support hardware
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]
If you're still having trouble, please contact the list owner at:
<mailto:list
admin@aus-city
com>
The following physical address is associated with this mailing list:
http://www aus-city com
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list