09 21 07
George Diller Kennedy Space Center, Fla 321-867-2468 george h diller@nasa gov
STATUS REPORT: S-092107
NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT
Note: NASA's Kennedy Space Center issues Space Shuttle Processing
Status Reports periodically and is the source for information
regarding processing activities associated with the vehicles and
payloads
If you are a member of the media and would like further
information, visit:
http://www
nasa
gov/centers/kennedy/news/index
html
Mission: STS-120 - 23rd International Space Station Flight - U S Node 2 (Harmony) Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: Targeted for Oct 23, 2007 Launch Pad: 39A Crew: Melroy, Zamka, Parazynski, Wheelock, Wilson, Nespoli and Tani Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility bay No 3, workers replaced four seals and their associated components on the right-hand main landing gear strut after a hydraulic fluid leak was discovered during the "weight on wheels" test The landing gear has been reassembled and testing is under way If all tests are successful, Discovery will roll over to the Vehicle Assembly Building on Sunday morning
In the assembly building, mate closeout work is complete on the external fuel tank and solid rocket boosters in high bay No 1, and preparations are in progress for the orbiter mate on Monday Rollout to Pad 39A is targeted for Sept 30
Mission: STS-122 - 24th International Space Station Flight - Columbus Module Vehicle: Atlantis (OV-104) Location: Orbiter Processing Facility Bay 1 Launch Date: Targeted for Dec 6, 2007 Launch Pad: 39A Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin and Walheim Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility Bay No 1, workers have reinstalled the left orbital maneuvering system pod, which was removed for a valve repair, and interface verification is under way Technicians continue checkout of the water spray boiler system Preparations for engine installation, which is scheduled for next week, are also in progress Checkout of the orbiter docking system is complete
ET-125, the external fuel tank for STS-122, was lifted into a checkout cell in the Vehicle Assembly Building last weekend, and processing of the tank is under way A mobile launch platform was moved into high bay No 3 of the assembly building this week, and stacking of the STS-122 solid rocket boosters is scheduled to begin next week
Mission: STS-123 - 25th International Space Station Flight - Kibo, Dextre Vehicle: Endeavour (OV-105) Location: Orbiter Processing Facility Bay 2 Launch Date: Targeted for Feb 14, 2008 Launch Pad: 39A Crew: Gorie, Johnson, Linnehan, Doi, Behnken, Foreman and Reisman Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles
In Orbiter Processing Facility bay No 2, functional testing of the orbital maneuvering system pods is nearing completion The main landing gear tires were removed to allow for brake inspection The orbiter boom sensor system was removed from the orbiter to allow for inspection of the pedestals, which support the boom in the payload bay
Air data probe inspections are complete Freon coolant loop No 1 has been de-serviced Repair work began this week on the left-hand radiator, which was damaged by micrometeoroid impacts during the last mission
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]
If you're still having trouble, please contact the list owner at:
<mailto:list
admin@aus-city
com>
The following physical address is associated with this mailing list:
http://www aus-city com
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list