Date: January 5th 2008

Jan 4, 2008

Candrea Thomas Kennedy Space Center, Fla 321-867-2468 candrea k thomas@nasa gov

STATUS REPORT: S-010408

NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT

Note: NASA's Kennedy Space Center issues Space Shuttle Processing Status Reports periodically and is the source for information regarding processing activities associated with the vehicles and payloads If you are a member of the media and would like further information, visit:
http://www nasa gov/centers/kennedy/news/index html

Mission: STS-122 - 24th International Space Station Flight - Columbus Module Vehicle: Atlantis (OV-104) Location: Launch Pad 39A Launch Date: Under Review Crew: Frick, Poindexter, Schlegel, Eyharts, Love, Melvin, Walheim Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

Shuttle Program managers requested Thursday that flight control teams and ground operations teams protect for a Jan 24 launch date As work progresses, that date will be modified as required Other launch opportunities could come between Jan 24 and the first week of February

At Launch Pad 39A, preparations began for modifications to the engine cutoff (ECO) sensors New external connectors and feed-through assemblies will arrive at KSC Jan 5-6 Change out is expected to be completed by Jan 10 Testing of the faulty ECO sensor continues at Marshall Space Flight Center with cryo testing planned next week

Troubleshooting on the ascent thrust vector control (ATVC) was performed Jan 3, and the ATVC will be removed, replaced, and then retested over the weekend

Mission: STS-123 - 25th International Space Station Flight - Kibo, Dextre Vehicle: Endeavour (OV-105) Location: Orbiter Processing Facility Bay 2 Launch Date: Under Review Launch Pad: 39A Crew: Gorie, Johnson, Linnehan, Doi, Behnken, Foreman, Reisman Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

Shuttle Program managers have authorized work to begin to remove the foam on the feed-through connector on Endeavour's tank prior to the STS-123 mission Due to a five-week planning template used in scheduling back-to-back launches off a single pad, STS-123 will not launch on Feb 14 The launch date will be updated consistent with the progress on STS-122

In Orbiter Processing Facility bay No 2, payload bay door strong backs were installed Jan 3 while main landing gear and nose gear were retracted in support of positive pressure structural leak checks and TPS work A landing gear functional test is scheduled for today

In high bay No 1 of the Vehicle Assembly Building, booster closeouts are completed and the boosters are ready to support mate when directed

Mission: STS-124 - 26th International Space Station Flight - Kibo Pressurized Module, Japanese Remote Manipulator System Vehicle: Discovery (OV-103) Location: Orbiter Processing Facility Bay 3 Launch Date: Targeted for April 24, 2008 Launch Pad: 39A Crew: Kelly, Ham, Nyberg, Garan, Fossum, Hoshide Inclination/Orbit Altitude: 51 6 degrees/122 nautical miles

In Orbiter Processing Facility bay No 3, the shuttle's payload bay doors are open The Ku-band antenna was deployed Jan 2 The fuel cell single-cell voltage test is scheduled for today Window No 7 purge barrier installation was performed Jan 3 Radiator repairs will continue Saturday and Sunday

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: example@example.com

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

http://www aus-city com/cgi-bin/dada/mail cgi/list/[list]

If you're still having trouble, please contact the list owner at:

<mailto:list
admin@aus-city
com>

The following physical address is associated with this mailing list:

http://www aus-city com

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list