There are 2 messages totalling 63 lines in this issue
Topics of the day:
Date: Mon, 16 Mar 2009 09:56:40 -0500 From: info@JSC NASA GOV Subject: STS-119 MCC Status Report #02
STS-119 Report #02 Monday, March 16, 2009 - 9:30 a m CDT Mission Control Center, Houston, Texas
The astronauts on board space shuttle Discovery plan a day of orbiter inspection on their way to deliver a new set of solar arrays to the International Space Station
The crew was awakened at 9:13 a m CDT to the sounds of “Free Bird” by Lynyrd Skynyrd, played for Pilot Tony Antonelli
First up for Antonelli and Commander Lee Archambault is a planned firing of the shuttle’s orbital maneuvering system engines to refine its approach to the station for Tuesday’s planned docking at 4:13 p m
Then, Antonelli joins Mission Specialists Joseph Acaba and John Phillips to begin inspection of critical elements of Discovery’s heat shield The astronauts use the shuttle robot arm to lift the Orbiter Boom Sensor System (OBSS) from the starboard sill of the payload bay and move it into position to examine the reinforced carbon-carbon panels that line the leading edges of both wings and the orbiter’s nose cap Data gathered by the OBSS sensor packages is transmitted to Earth for review by specialists looking for evidence of damage caused by debris during the shuttle’s Sunday evening climb into orbit
Also on tap for Monday are checkouts of the spacesuits to be worn by Acaba and Mission Specialists Steve Swanson and Richard Arnold during the three spacewalks they’re to conduct from the International Space Station The crew also will prepare the orbiter docking system and a suite of rendezvous tools they’ll use during Tuesday’s approach to the station
International Space Station Commander Mike Fincke and flight engineers Yury Lonchakov and Sandra Magnus are scheduled to spend today getting ready for the arrival of Discovery, which is delivering Japan Aerospace Exploration Agency astronaut Koichi Wakata to take over for Magnus; she’ll come home with the shuttle crew later this month after some four months in orbit
Along with the S6 Truss element and another set of U S solar array wings, Discovery’s crew is delivering a new distillation assembly to get the station’s water recycling system up to full operation for a doubling of the station’s crew size later this summer
The next shuttle status report will be issued at the end of the crew day, or earlier if events warrant
NASA Johnson Space Center Mission Status Reports and other information are available automatically by sending an Internet electronic mail message to listserv@listserver jsc nasa gov In the body of the message (not the subject line) users should type "subscribe hsfnews" (no quotes) This will add the e-mail address that sent the subscribe message to the news release distribution list The system will reply with a confirmation via e-mail of each subscription Once you have subscribed you will receive future news releases via e-mail
Date: Mon, 16 Mar 2009 20:27:47 -0500 From: info@JSC NASA GOV Subject: STS-119 MCC Status Report #03
STS-119 Report #03 Monday, March 16, 2009 - 8 p m CDT Mission Control Center, Houston, Texas
HOUSTON – Space Shuttle Discovery’s first full day in space focused on an up close inspection of its wing leading edge panels using the robotic arm and Orbiter Boom Sensor System extension
Combined with video documentation on launch day and photographs taken by the International Space Station crew when Discovery approaches on Tuesday afternoon, imagery experts will analyze the photographs and video to assess the health of the shuttle’s Thermal Protection System for reentry
The five-hour inspection today paralleled work by the seven crew members onboard to prepare for the docking Tuesday planned for 4:13 p m Some of that work included pre-positioning transfer items and checking out spacesuits that will be used during the three spacewalks planned while Discovery is docked
In preparation for docking, the crew tested rendezvous equipment, installed an Orbiter Docking System “centerline” camera and extended the docking ring atop the docking system before going to bed just before 1 a m Tuesday
The shuttle crew includes Koichi Wakata – Japanese astronaut on his third mission – who will become the newest station crew member after docking and hatch opening He will replace Sandy Magnus who returns home after four months aboard the station
On board the space station, Commander Mike Fincke and Flight Engineers Yury Lonchakov and Magnus prepared for Discovery’s arrival by reviewing procedures they will use to capture images of Discovery as it approaches and conducts a backflip exposing its underside tiles to the paparazzi armed with long-range lenses inside the station
At about 4:30 Monday afternoon, trajectory experts called off the need for a station maneuver to avoid a piece of space debris when calculations showed it would pass harmlessly by the complex
The next status report will be issued after crew wake-up at 8:43 a m Tuesday, or before, if events warrant
NASA Johnson Space Center Mission Status Reports and other information are available automatically by sending an Internet electronic mail message to listserv@listserver jsc nasa gov In the body of the message (not the subject line) users should type "subscribe hsfnews" (no quotes) This will add the e-mail address that sent the subscribe message to the news release distribution list The system will reply with a confirmation via e-mail of each subscription Once you have subscribed you will receive future news releases via e-mail
End of HSFNEWS Digest - 16 Mar 2009 to 17 Mar 2009 (#2009-20)
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
<[program_url]/list/[list]>
If you're still having trouble, please contact the list owner at:
<mailto:[list_owner_email]>
The following physical address is associated with this mailing list:
[physical_address]
This mailing list is announce-only.
NASA Reports list
Private list