Date: July 21st 2009

July 20, 2009

Amber Philman Kennedy Space Center, Fla 321-867-2468 amber n philman@nasa gov

STATUS REPORT: ARES-I-X-072009

ARES I-X STATUS REPORT

Launch Vehicle: Ares I-X Launch Date: No earlier than August 30, 2009 Launch Pad: 39B at NASA's Kennedy Space Center, Fla

Ares I-X Flight Hardware This past week's milestones include:

  • Forward center motor segment stacking

  • Final of four motor segments stacking

  • Stack 1 modal test

A series of sensors strategically located throughout the stack will measure the amount and direction of movement, as the electro-mechanical shakers impose random loads to determine the rocket segment's first several bending modes

  • Instrumentation testing

Last week milestones completed include: - Super Stack 1 assembly complete

Stack one is made up of eight individual pieces: interstages 1 and 2, the frustum, the forward skirt extension, the forward skirt and the aft, center and forward segments of the fifth segment simulator It also includes two internal elements, the roll control system and the first stage avionics module

  • Aft center motor segment was moved from the Rotation Processing and Surge Facility to the Vehicle Assembly Building and attached to the aft assembly in High Bay 3

  • Camera installed on the upper stage simulator

Next processing milestones: - Forward segment stacking

  • Flight instrumentation testing ongoing

Ares I-X Ground Support Equipment - At Launch Pad 39B, modification are ongoing

The vehicle stabilization system is being built at the base of the launch pad

The Ares I-X flight test will provide NASA an early opportunity to check and prove hardware, analysis and modeling methods, and facilities and ground operations needed to develop the Ares I, which is NASA's next crew launch vehicle The test also will allow NASA to gather critical data during the ascent of the integrated stack, which will help inform the design of the Ares I rocket and the Orion crew exploration vehicle The data will ensure the entire vehicle system is safe and fully operational before astronauts begin traveling in it to the International Space Station and moon

For more information about the Ares I-X flight test, visit:

http://www nasa gov/ares

Previous status reports are available at:

http://www nasa gov/centers/kennedy/moonandmars/status/index html

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: example@example.com

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

<[program_url]/list/[list]>

If you're still having trouble, please contact the list owner at:

<mailto:[list_owner_email]>

The following physical address is associated with this mailing list:

[physical_address]

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list