Date: August 5th 2009

Aug 4, 2009

Amber Philman Kennedy Space Center, Fla 321-867-2468 amber n philman@nasa gov

STATUS REPORT: ARES-I-X-080409

ARES I-X STATUS REPORT

Launch Vehicle: Ares I-X Launch Date: Oct 31, pending final NASA Headquarters approval Launch Pad: 39B at NASA's Kennedy Space Center, Fla

Ares I-X Flight Hardware Last week's milestones include: - Super Stack 1 lift and mate to the RSRM on MLP 1 in Vehicle Assembly Building High Bay 3 (VAB HB3) - Electrical instrumentation testing

Next processing milestones: - Super Stack 2 lift and mate to Super Stack 1 on MLP 1 in VAB HB3 - Ballasts, or weights, will be placed into Super Stack 2 - Super Stack 3 lift and mate to Super Stack 2 on MLP 1 in VAB HB3

Ares I-X Ground Support Equipment - At Launch Pad 39B, modifications are ongoing

The Ares I-X flight test will provide NASA an early opportunity to check and prove hardware, analysis and modeling methods, and facilities and ground operations needed to develop the Ares I, which is NASA's next crew launch vehicle The test also will allow NASA to gather critical data during the ascent of the integrated stack, which will help inform the design of the Ares I rocket and the Orion crew exploration vehicle The data will ensure the entire vehicle system is safe and fully operational before astronauts begin traveling in it to the International Space Station and moon

For more information about the Ares I-X flight test, visit:

http://www nasa gov/ares

Previous status reports are available at:

http://www nasa gov/centers/kennedy/moonandmars/status/index html

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: example@example.com

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

<[program_url]/list/[list]>

If you're still having trouble, please contact the list owner at:

<mailto:[list_owner_email]>

The following physical address is associated with this mailing list:

[physical_address]

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list