Sept 11, 2009
George H Diller Kennedy Space Center, Fla 321-867-2468 george h diller@nasa gov
STATUS REPORT: ELV-091109
EXPENDABLE LAUNCH VEHICLE STATUS REPORT
Mission: Space Tracking and Surveillance System - Demonstrators Program (STSS-Demo) Launch Vehicle: Delta II 7920-10 Launch Pad: Launch Pad 17-B, Cape Canaveral Air Force Station, Fla Launch Date: Sept 18, 2009 Launch Window: 8 - 8:58 a m EDT
The STSS Demo spacecraft Interface Verification Test with the Delta II rocket and the spacecraft functional test that followed are both complete The Flight Program Verification test, an electrical and mechanical test involving the Delta II and the spacecraft, has also been completed The installation of the payload fairing around the STSS spacecraft is set for this weekend
The Flight Readiness Review is scheduled for Sept 14 Loading of the hypergolic propellants aboard the Delta II second stage will follow on Sept 15 On Sept 17 at 11 p m , the mobile service tower will be pulled away from the Delta II rocket On launch day, Sept 18, the terminal countdown begins at 5:20 a m to start the loading of the RP-1 fuel and liquid oxygen aboard the Delta II first stage
Spacecraft: Wide-field Infrared Survey Explorer (WISE) Launch Vehicle: Delta II 7320 Launch Pad: SLC-2, Vandenberg Air Force Base, Calif Launch Date: Dec 7, 2009 Launch Window: 9:10 - 9:23 a m EST
At the Astrotech payload processing facility on north Vandenberg, the WISE spacecraft functional testing is complete This week no work was scheduled to allow for crew crest after the longer work days required to support the ten days of spacecraft functional testing Processing will resume next week
Vandenberg Air Force Base experienced the effects of a 3 9 magnitude (light) earthquake at 4:22 a m PDT on Sept 10 The epicenter was offshore in the Pacific Ocean approximately 9 miles west of Lompoc WISE personnel performed an inspection of the spacecraft and no anomalies were noted Also, nothing unusual was found after an inspection of the Astrotech payload processing facility
Build-up of the Delta II at Space Launch Complex 2 is scheduled to begin on Oct 19 with hoisting of the first stage into the launcher
Spacecraft: Solar Dynamics Observatory (SDO) Launch Vehicle: Atlas V-401 Launch Pad: Launch Complex 41, Cape Canaveral Air Force Station, Fla Launch Date: Feb 3, 2010 Launch Window: 10:53 - 11:53 a m EST
With the launch being rescheduled to Feb 3, 2010, and major SDO testing complete, spacecraft processing has reached a logical point to begin a spacecraft dwell period SDO and spacecraft ground test support equipment have been powered off SDO has been placed within environmentally protective double coverings
Previous status reports are available at:
http://www nasa gov/centers/kennedy/launchingrockets/status/index html
-end-
To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov
The following information is a reminder of your current mailing list subscription:
You are subscribed to the following list: [list_name]
using the following email: example@example.com
You may automatically unsubscribe from this list at any time by visiting the following URL:
http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/
If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism
You may also change your subscription by visiting this list's main screen:
<[program_url]/list/[list]>
If you're still having trouble, please contact the list owner at:
<mailto:[list_owner_email]>
The following physical address is associated with this mailing list:
[physical_address]
This mailing list is announce-only.
Shuttle / ISS Status Report list
Private list