STATUS REPORT: ELV-100909

EXPENDABLE LAUNCH VEHICLE STATUS REPORT

Spacecraft: Wide-field Infrared Survey Explorer (WISE) Launch Vehicle: Delta II 7320 Launch Pad: SLC-2, Vandenberg Air Force Base, Calif Launch Date: Dec 7, 2009 Launch Window: 6:10 - 6:23 a m PST

At the Astrotech payload processing facility on north Vandenberg, WISE spacecraft testing is complete Work now is beginning to prepare the spacecraft for loading of the cryogenic hydrogen which will be used to supercool the infrared telescope during its six months of observations

Build-up of the Delta II rocket at Space Launch Complex 2 is scheduled to begin on Oct 16 with hoisting of the first stage into the launcher

Spacecraft: Solar Dynamics Observatory (SDO) Launch Vehicle: Atlas V-401 Launch Pad: Launch Complex 41, Cape Canaveral Air Force Station, Fla Launch Date: Feb 3, 2010 Launch Window: 10:53 - 11:53 a m EST

Propulsion system testing and leak checks of the spacecraft are under way The full observatory comprehensive performance test is complete

The Atlas rocket first stage booster is set to arrive by air at Cape Canaveral Air Force Station on Oct 26, followed by the Centaur upper stage on Oct 29

Previous status reports are available at:

http://www nasa gov/centers/kennedy/launchingrockets/status/index html

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: example@example.com

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/[list]/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

<[program_url]/list/[list]>

If you're still having trouble, please contact the list owner at:

<mailto:[list_owner_email]>

The following physical address is associated with this mailing list:

[physical_address]

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list