Date: December 24th 2009

Dec 23, 2009

George H Diller Kennedy Space Center, Fla 321-867-2468 george h diller@nasa gov

STATUS REPORT: ELV-122309

EXPENDABLE LAUNCH VEHICLE STATUS REPORT

Spacecraft: Solar Dynamics Observatory (SDO) Launch Vehicle: Atlas V-401 Launch Pad: Complex 41, Cape Canaveral Air Force Station Launch Date: Feb 3, 2010 Launch Window: 10:53 - 11:53 a m EST

The Centaur upper stage, the second stage of the Atlas V rocket, was transported from the hangar at the Atlas Spaceflight Operations Center (ASOC), to the Vertical Integration Facility located at Launch Complex 41 It was then hoisted atop the Atlas first stage Integrated testing for the Atlas V will now begin

At the Astrotech payload processing facility, ground support equipment is being set up in preparation for placing propellants aboard the SDO spacecraft Fuel is scheduled to be loaded aboard on Jan 4 and oxidizer on Jan 7 The Atlas V fairing is currently scheduled to be installed around the SDO spacecraft on Jan 15 and then transported to Complex 41 for hoisting atop the Atlas V on Jan 20

Spacecraft: Geostationary Operational Environmental Satellite (GOES-P) Launch Vehicle: Delta IV Launch Pad: Complex 37, Cape Canaveral Air Force Station Launch Date: Feb 25, 2010

With the arrival of GOES-P on Dec 17, Boeing spacecraft engineers and technicians are beginning testing of the satellite at the Astrotech payload processing facility located near the Kennedy Space Center Electrical testing of the spacecraft bus was completed this week The spacecraft is now powered down for the holidays

Testing of the instruments will begin Jan 6 The full testing of the satellite takes approximately six weeks and involves the imaging system, instrumentation, communications and power systems Then the satellite will be fueled with the propellant necessary for orbit maneuvers and the attitude control system Once this is completed, the spacecraft will be encapsulated in the Delta IV payload fairing in preparation for being transported to the launch pad and hoisted atop the rocket

The Delta IV United Launch Alliance Delta IV expendable launch vehicle will be installed into the launcher at Complex 37 in early January GOES-P, to be launched for NASA and NOAA, is a United Launch Alliance commercial launch under a Federal Aviation Administration license

Previous status reports are available at:

http://www nasa gov/centers/kennedy/launchingrockets/status/index html

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: example@example.com

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/STS_ISS_STATUS/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

<[program_url]/list/[list]>

If you're still having trouble, please contact the list owner at:

<mailto:[list_owner_email]>

The following physical address is associated with this mailing list:

[physical_address]

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list