Date: February 6th 2010

Feb 5, 2010

George H Diller Kennedy Space Center, Fla 321-867-2468 george h diller@nasa gov

STATUS REPORT: ELV-020510

AMENDED EXPENDABLE LAUNCH VEHICLE STATUS REPORT

Spacecraft: Solar Dynamics Observatory (SDO) Launch Vehicle: Atlas V-401 Launch Pad: Complex 41, Cape Canaveral Air Force Station Launch Date: Feb 9, 2010 Launch Window: 10:30 - 11:30 a m EST

At Launch Complex 41, preparations for the launch of SDO aboard the Atlas V continue to go well and are on schedule Connection of launch vehicle ordnance was done today, and launch vehicle closeouts for flight are under way The SDO team has also performed its ordnance activities and has completed the spacecraft closeouts for flight

The countdown mission dress rehearsal was held Thursday at the Atlas Space Flight Operations Center Friday, the Flight Readiness Review was held in the mission briefing room At its conclusion, there were no significant open items If the STS-130 launch should be postponed 24 hours, then SDO will be rescheduled for Feb 10 The Launch Readiness Review will be held on Feb 7

The Atlas V will be rolled out from the Vertical Integration Facility to the launch pad for launch at 8 a m on Jan 8 The countdown will begin at 3:30 a m on Feb 9 Cryogenic tanking operations start at 8:30 a m leading to a liftoff at 10:30 a m

Spacecraft: Geostationary Operational Environmental Satellite (GOES-P) Launch Vehicle: Delta IV Launch Pad: Complex 37, Cape Canaveral Air Force Station, Fla Launch Date: March 1, 2010 Launch Window: 6:19 - 7:19 p m EST

At the Astrotech payload processing facility, the GOES-P satellite is being enclosed into the Delta IV payload fairing Friday

Work to fuel the spacecraft with the propellant necessary for orbit maneuvers and the attitude control system has been completed, and the spacecraft was mated to the payload attach fitting on Feb 1

At Launch Complex 37, the wet countdown dress rehearsal with the rocket fully fueled is scheduled to be conducted next week on Feb 8 GOES-P then will be transported to the launch pad and mated to the Delta IV on Feb 13

GOES-P, to be launched for NASA and NOAA, is a United Launch Alliance commercial launch for Boeing Launch Services under a Federal Aviation Administration license

Previous status reports are available at:

http://www nasa gov/centers/kennedy/launchingrockets/status/index html

-end-

To subscribe to the list, send a message to: ksc-subscribe@newsletters nasa gov To remove your address from the list, send a message to: ksc-unsubscribe@newsletters nasa gov



The following information is a reminder of your current mailing list subscription:

You are subscribed to the following list: [list_name]

using the following email: example@example.com

You may automatically unsubscribe from this list at any time by visiting the following URL:

http://www aus-city com/cgi-bin/dada/mail cgi/u/STS_ISS_STATUS/

If the above URL is inoperable, make sure that you have copied the entire address Some mail readers will wrap a long URL and thus break this automatic unsubscribe mechanism

You may also change your subscription by visiting this list's main screen:

<[program_url]/list/[list]>

If you're still having trouble, please contact the list owner at:

<mailto:[list_owner_email]>

The following physical address is associated with this mailing list:

[physical_address]

Forward to a Friend
 
  • This mailing list is a public mailing list - anyone may join or leave, at any time.
  • This mailing list is announce-only.

Shuttle / ISS Status Report list

Privacy Policy:

Private list