June 19th 2009 PST
HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science DAILY REPORT #4869 PERIOD COVERED: 5am June 17 - 5am June 18, 2009 (DOY 168/0900z-169/0900z) OBSERVATIONS SCHEDULED: None FLIGHT OPERATIONS SUMMARY: Significant Spacecraft Anomalies: (The following are preliminary reports of potential non-nominal performance that will be investigated.) HSTARS: (None) COMPLETED OPS REQUEST: (None) COMPLETED OPS NOTES: (None) SCHEDULED & ...Continue Reading
June 18th 2009 PST
HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science DAILY REPORT #4868 PERIOD COVERED: 5am June 16 - 5am June 17, 2009 (DOY 167/0900z-168/0900z) OBSERVATIONS SCHEDULED: None FLIGHT OPERATIONS SUMMARY: Significant Spacecraft Anomalies: (The following are preliminary reports of potential non-nominal performance that will be investigated.) HSTARS: (None) COMPLETED OPS REQUEST: 18534-1 - Uplink Gyro Calibration Loads @ 167/1436z 18531-1 - Configure for Gyro Calibration ...Continue Reading
June 17th 2009 PST
HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science DAILY REPORT #4867 PERIOD COVERED: 5am June 15 - 5am June 16, 2009 (DOY 166/0900z-167/0900z) OBSERVATIONS SCHEDULED COS23/FUV/S/C 11356 COS FUV Initial On-Orbit Turn-On This proposal specifies the procedure for SMOV initial HV turn-on andramp-up of the COS FUV detector. (The FUV will have been commanded toits Operate state to support execution of proposal 11353.) The ...Continue Reading
June 16th 2009 PST
HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science DAILY REPORT #4866 PERIOD COVERED: 5am June 12 - 5am June 15, 2009 (DOY 163/0900z-166/0900z) OBSERVATIONS SCHEDULED WFC3/UV 11808 WFC3 UVIS Bowtie Monitor The UVIS detector was observed during ground testing to occasionally exhibit flat field and dark variations with a bowtie pattern. These variations are most significant as ~1% flat field (gain) variations across the field of view. It is believ ...Continue Reading
June 13th 2009 PST
HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science DAILY REPORT #4865 PERIOD COVERED: 5am June 11 - 5am June 12, 2009 (DOY 162/0900z-163/0900z) OBSERVATIONS SCHEDULED ACS/WFC 11371 CCD Cross Talk The goal of this program is to verify the amount of cross talk in the ACS WFC detectors in the post SM4 era. Before the failure of ACS the cross talk was very low at gain=1 e-/DN and almost not existent at gain=2 e-/DN. We plan to verify if the cross talk with the new el ...Continue Reading
June 12th 2009 PST
HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science DAILY REPORT #4864 PERIOD COVERED: 5am June 10 - 5am June11, 2009 (DOY 161/0900z-162/0900z) OBSERVATIONS SCHEDULED ACS/WFC 11510 External CTE Monitor Observations of 47 Tuc with half-FOV sized dithers to check the impact of CTE on photometry after SM4. COS23/FUV/S/C 11356 COS FUV Initial On-Orbit Turn-On This proposal specifies the procedure for SMOV initial HV turn-on and ramp-up of the COS FUV detector. (The FUV wil ...Continue Reading
June 11th 2009 PST
HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science DAILY REPORT #4863 PERIOD COVERED: 5am June 9 - 5am June 10, 2009 (DOY 160/0900z-161/0900z) OBSERVATIONS SCHEDULED ACS/WFC/S/C 11811 ACS CEB-R Optimization Iteration 3 During the early weeks of SMOV the ACS-R team will work to find the best parameters for CEB-R and the WFC CCD operations before continuing with the normal SMOV activities and eventually enable science operations. This optimization needs to be done i ...Continue Reading
June 10th 2009 PST
HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science DAILY REPORT #4862 PERIOD COVERED: 5am June 8 - 5am June 9, 2009 (DOY 159/0900z-160/0900z) OBSERVATIONS SCHEDULED ACS/WFC/S/C 11811 ACS CEB-R Optimization Iteration 3 During the early weeks of SMOV the ACS-R team will work to find the best parameters for CEB-R and the WFC CCD operations before continuing with the normal SMOV activities and eventually enable science operations. ...Continue Reading
June 8th 2009 PST
HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science DAILY REPORT #4861 PERIOD COVERED: 5am June 5 - 5am June 8, 2009 (DOY 156/0900z-159/0900z) OBSERVATIONS SCHEDULED COS/NUV 11467 NUV Detector Internal Functionality and Operation The functionality and operation of the COS NUV detector will be tested using internal sources. Several science exposures will be taken in TIME-TAG using both the DEUTERIUM and Pt/Ne lamps. This is SMOV Activity COS-06 COS05/NUV 11466 NUV ...Continue Reading
June 5th 2009 PST
HUBBLE SPACE TELESCOPE - Continuing to collect World Class Science DAILY REPORT #4859 PERIOD COVERED: 5am June 3 - 5am June 4, 2009 (DOY 154/0900z-155/0900z) OBSERVATIONS SCHEDULED ACS/WFC/S/C 11810 ACS CEB-R Optimization Iteration 2 During the early weeks of SMOV the ACS-R team will work to find the best parameters for CEB-R and the WFC CCD operations before continuing with the normal SMOV activities and eventually enable science operations. This optimization needs to be done in an it ...Continue Reading
This mailing list is announce-only.
HST Status Report list
Private list