ISS Status Report ISS Daily Summary Report – 11/29/2018
- Thu 29 Nov 2018 04:00:PM
JEM Airlock (JEMAL) Depressurization: The JEM Airlock was depressurized in preparation for the transfer of the NanoRacks External Platform Inserts (NREP) back to the Exposed Facility Unit (EFU) 4 location. The NREP was brought inside ISS earlier this week so the crew could exchange the sortie 3 payload for the sortie 4 payload. Each NREP …
Source: ISS Daily Summary Report – 11/29/2018
Source: ISS Daily Summary Report – 11/