ISS Status Report ISS Daily Summary Report – 9/16/2021
- Thu 16 Sep 2021 04:00:PM
Payloads Four Bed CO2 Scrubber: The crew continued with the installation of the Four bed CO2 Scrubber hardware by connecting power, data, and fluid lines. Four Bed CO2 Scrubber demonstrates a technology for removing carbon dioxide (CO2) from the atmosphere on a spacecraft. The technology is based on the current system in use on the ISS …
Source: ISS Daily Summary Report - 9/16/2021
Source: ISS Daily Summary Report - 9/