0 members (),
1,783
guests, and
52
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
S |
M |
T |
W |
T |
F |
S |
|
|
|
|
|
|
|
1
|
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
|
23
|
24
|
25
|
26
|
27
|
28
|
29
|
|
30
|
31
|
|
|
|
|
|
|
There are no members with birthdays on this day. |
Volcano earthquake report for Friday, 31 Jul 2026
• World Earthquake Report for Friday, 31 July 2026
• Light mag. 3.9 earthquake - Philippine Sea, 57 km east of Sulangan, Philipp...
• Small tremor of magnitude 3.1 just reported 10 km southwest of Naples, Ital...
• Seismic-like event, possible earthquake, reported few minutes ago near Napl...
• Strong mag. 5.0 earthquake - 65 km northeast of Pu'er, Yunnan Sheng, China,...
|
#1683
Fri 10 Jan 2003 04:47:PM
|
Joined: Feb 2001
Posts: 678,976
Launch Director
|
OP
Launch Director
Joined: Feb 2001
Posts: 678,976 |
KENNEDY SPACE CENTER <br />SHUTTLE & PAYLOAD PROCESSING STATUS REPORT <br />Thursday, Jan. 9, 2003 (10 a.m.)<br /><br /><br />For the latest Shuttle status on the web visit<br />< http://www-pao.ksc.nasa.gov/kscpao/status/stsstat/current.htm>. <br />For the latest weather forecast visit<br />< http://www-pao.ksc.nasa.gov/kscpao/status/weatstat/forecast.htm>. <br />Visit < http://www-pao.ksc.nasa.gov/kscpao/schedule/schedule.htm> for the<br />latest schedule of future Shuttle missions. KSC press releases can be found<br />at < http://www-pao.ksc.nasa.gov/kscpao/release/release.htm>. <br />The KSC home page can be found at < http://www.ksc.nasa.gov/>. <br /><br /><br />MISSION STS-107 -SPACEHAB/ FREESTAR MICROGRAVITY RESEARCH MISSION<br /><br /><br />VEHICLE - Columbia/OV-102<br />TARGET LAUNCH DATE: Jan. 16, 2003<br />TARGET LAUNCH PERIOD: 10 a.m. - 2 p.m.<br />TARGET LANDING DATE: Feb. 1, 2003<br />MISSION DURATION: 16 days<br />CREW: Husband, McCool, Anderson, Chawla, Brown, Clark, Ramon<br />ORBITAL INSERTION ALTITUDE AND INCLINATION: 150 nautical miles/39 degrees<br /><br /><br />Shuttle Processing Note: Prelaunch preparations continue at Pad 39-A for<br />Shuttle Columbia's Jan. 16 launch on the Spacehab microgravity research<br />mission. Orbiter Maneuvering System/Reaction Control System flight<br />pressurization is complete. Orbiter aft closeout is in work, with the doors<br />scheduled to be closed Friday morning. Mission managers are currently<br />meeting for the pre-launch STS-107 Flight Readiness Review. No inspections<br />are planned on Columbia related to the BSTRA ball crack evaluation.<br /><br /><br />MISSION STS-114 -- 17TH ISS FLIGHT (ULF1) - CREW ROTATION/MULTI-PURPOSE<br />LOGISTICS MODULE<br /><br /><br />VEHICLE: Atlantis/OV-104<br />TARGET LAUNCH DATE: March 1, 2003 <br />TARGET LANDING DATE: March 13, 2003 <br />MISSION DURATION: 12 days <br />SHUTTLE CREW: Collins, Kelly, Noguchi, Robinson<br />ISS EXPEDITION CREW 7: Malenchenko, Kaleri, Lu<br />ORBITAL ALTITUDE AND INCLINATION: 122 nautical miles, 51.6 degrees<br /><br /><br />Shuttle Processing Note: Processing continues for Atlantis' March launch to<br />the International Space Station. Water Spray Boiler checkout, and heat<br />shield and Forward Reaction Control System installation is in work. As part<br />of the analysis under way of the crack found in the BSTRA on Discovery,<br />technicians completed the inspection of Atlantis's lines and did not find<br />any cracks. <br /><br /><br />MISSION STS-115 -- 18th ISS FLIGHT (12A) ? P3/P4 SOLAR ARRAYS<br /><br /><br />VEHICLE - Endeavour/OV-105<br />TARGET LAUNCH DATE: May 23, 2003<br />TARGET LANDING DATE: June 3, 2003<br />MISSION DURATION: 10 days<br />CREW: Jett, Ferguson, Tanner, Burbank, MacLean, Stefanyshyn-Piper<br />ORBITAL INSERTION ALTITUDE AND INCLINATION: 122 nautical miles/51.6 degrees<br /><br /><br />Shuttle Processing Note: Endeavour's deservicing and processing continues<br />for the STS-115 mission to the International Space Station scheduled in May<br />2003. Removal of all three Space Shuttle Main Engines is complete. Orbiter<br />Maneuvering System pod checkout is in work. Inspections are complete of the<br />12-inch and 17-inch BSTRAs on Endeavour and no cracks were found.<br /><br /><br />ORBITER MAJOR MODIFICATION PERIOD<br /><br /><br />VEHICLE: Discovery/OV-103<br /><br /><br />Shuttle Processing Note: An engineering evaluation continues following the<br />discovery of a surface crack found during standard Orbiter Maintenance and<br />Modification (OMM) inspections. The crack, located on a 2.25-inch diameter<br />metal ball, is associated with the Ball Strut Tie Rod Assembly (BSTRA)<br />inside Discovery's 17-inch liquid oxygen line. OMM work continues with Main<br />Propulsion System flow liner polishing and ongoing wire inspections and<br />repairs. <br /><br /><br />-- end --
|
|
CMS The Best Conveyancing solicitors conveyancing quotes throughout the UK
For any webhosting enquiries please email webmaster@aus-city.com
|
|
Entire Thread
|
KSC SHUTTLE & PAYLOAD PROCESSING STATUS REPORT Thursday, Jan. 9, 2003
|
Webmaster
|