Payloads Plant Habitat-02 Latch Evaluation: Following issues experienced with the Environmental Control System (ECS) installation a few weeks ago, the crew performed a more detailed inspection of the failed locking mechanism on the new ECS.  The inspection went well and the crew was able to lock and unlock the ECS system in the current configuration.  …

Source: ISS Daily Summary Report - 6/30/2020