|
0 members (),
1,133
guests, and
18
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
S |
M |
T |
W |
T |
F |
S |
|
|
|
|
|
|
|
1
|
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
|
23
|
24
|
25
|
26
|
27
|
28
|
29
|
|
30
|
31
|
|
|
|
|
|
|
There are no members with birthdays on this day. |
Volcano earthquake report for Sunday, 16 Aug 2026
• World Earthquake Report for Sunday, 16 August 2026
• World Earthquake Report for Sunday, 16 August 2026
• Seismic-like event, possible earthquake, reported few minutes ago near Gran...
• Seismic-like event, possible earthquake, reported few minutes ago near Gran...
|
#29486
Sun 28 May 2006 09:10:PM
|
Joined: Feb 2001
Posts: 3,536
Mission Commander
|
OP
Mission Commander
Joined: Feb 2001
Posts: 3,536 |
05.26.06<br /><br />Jessica Rye<br />Kennedy Space Center, Fla.<br />(321) 867-2468<br /><br />STATUS REPORT: S-052606<br /><br />NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT<br /><br />Note: NASA's Kennedy Space Center issues Space Shuttle Processing <br />Status Reports periodically and is the source for information <br />regarding processing activities associated with the vehicles and <br />payloads. This report does not necessarily reflect the chronological <br />order of future space shuttle missions. If you are a member of the <br />media and would like further information, visit: <br /> http://www.nasa.gov/centers/kennedy/news/index.html <br /><br />Mission: STS-121 - 18th International Space Station Flight (ULF1.1) - <br />Multi-Purpose Logistics Module <br />Vehicle: Discovery (OV-103) <br />Location: Launch Pad 39B <br />Launch Date: Launch Processing Window July 1-19, 2006 <br />Launch Pad: 39B <br />Crew: Lindsey, Kelly, Sellers, Fossum, Nowak, Wilson and Reiter <br />Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles <br /><br />Technicians continue performing system testing on Space Shuttle <br />Discovery while the vehicle is powered at Launch Pad 39B. Auxiliary <br />power units No. 1 and 3 connections and leak checks were completed, <br />with No. 2 in progress.<br /><br />The orbiter payloads were installed in Discovery's payload bay on <br />Wednesday. Discovery's payloads include the Italian-built logistics <br />module Leonardo, which will carry food, clothing, spare parts and <br />research equipment to the International Space Station. Other payloads <br />include two cargo carriers which contain heat shield tile samples, a <br />spare pump module and a replacement mobile transporter reel assembly.<br /><br />There is no significant holiday weekend work planned. <br /><br />Mission: STS-115 - 19th International Space Station Flight (12A) - <br />P3/P4 Solar Arrays <br />Vehicle: Atlantis (OV-104) <br />Location: Orbiter Processing Facility Bay 1 <br />Launch Date: No earlier than Aug. 28, 2006 <br />Launch Pad: 39B <br />Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper <br />Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles <br /><br />In Orbiter Processing Facility bay 1, technicians are carrying out <br />powered-up system testing on Atlantis for its mission to the <br />International Space Station. Gaseous nitrogen leak checks are <br />finished in the orbiter's mid-body. <br /><br />The remote manipulator system, or "shuttle arm," was installed and <br />functional testing has been completed. Workers also finished testing <br />the manipulator positioning mechanisms, which are the pedestals that <br />hold the arm in place in the payload bay during launch and landing.<br /><br />On Wednesday, the crawler transporter moved mobile launcher platform <br />No. 2 into high bay 3 of the Vehicle Assembly Building in preparation <br />for stacking operations to begin for the STS-115 mission. The first <br />solid rocket booster segment is scheduled to be lifted into the high <br />bay next week. <br /><br />Endeavour (OV-105)<br /><br />Powered-up system testing continues on Endeavour in Orbiter Processing <br />Facility bay 2 following an extensive modification period. Following <br />external airlock installation, the team completed connector mates on <br />Thursday and pick up with the docking system functional next week.<br /><br />Main propulsion system leak and functional testing continues. Ku-band <br />communications and radar system testing has begun and will be <br />finished following the docking system functional being completed.
|
|
CMS The Best Conveyancing solicitors conveyancing quotes throughout the UK
For any webhosting enquiries please email webmaster@aus-city.com
|
|
Forums60
Topics797,168
Posts831,958
Members2,960
| |
Most Online102,106 Jul 10th, 2026
|
|
|