|
0 members (),
5,522
guests, and
22
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
S |
M |
T |
W |
T |
F |
S |
|
|
|
1
|
2
|
3
|
4
|
5
|
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
|
13
|
14
|
15
|
16
|
17
|
18
|
19
|
|
20
|
21
|
22
|
23
|
24
|
25
|
26
|
|
27
|
28
|
29
|
30
|
|
|
|
|
There are no members with birthdays on this day. |
Small magnitude 3.6 earthquake strikes near Great Falls, Cascade County, Montana, USA
• Volcano earthquake report for Friday, 18 September 2026
• Possible earthquake reported minutes ago near Great Falls, Montana, USA
• Magnitude 4.6 earthquake strikes near Ponce, Segundo Barrio, Ponce Municipi...
• Small magnitude 3.4 earthquake strikes near Skegness, Lincolnshire, England...
• World Earthquake Report for Friday, 18 September 2026
|
#36064
Sun 04 Nov 2007 04:02:AM
|
Joined: Feb 2001
Posts: 3,536
Mission Commander
|
|
Mission Commander
Joined: Feb 2001
Posts: 3,536 |
STS-120 Report #20 Thursday, Nov. 1, 2007 - 4 p.m. CDT Mission Control Center, Houston, Texas HOUSTON � The space shuttle Discovery and International Space Station crews spent the day putting together tools and making preparations for Saturday�s spacewalk to repair a torn solar array.
Using strips of aluminum, a hole punch, bolt connector and 66 feet of wire, astronauts constructed solar array hinge stabilizers that should allow them to take the pressure off of the damaged hinges on the solar array. The contraption will work similarly to a cufflink, with the wire fed through a hole on the solar array and the strip of aluminum supporting it from below.
Mission Specialist Scott Parazynski will make the repair while suspended from a boom attached to the space station�s robotic arm, and Mission Specialist Doug Wheelock will assist from the station�s truss. Mission Specialist Stephanie Wilson and Expedition 16 Flight Engineer Dan Tani will be operating the station�s robotic arm from the robotic work station inside the Destiny laboratory.
Assuming that the plans can be completed before the crew wakes up at 12:08 a.m. Friday, the spacewalk is scheduled to begin at 5:28 a.m. Saturday. The crew will continue to work on the tools and procedures throughout Friday.
While the ground continued efforts to plan for Saturday�s spacewalk, the crew completed the initial outfitting of the Harmony node. It will remain at its temporary home on the Unity module until later this month when it will be permanently relocated to Destiny. It will serve as the docking port for future science laboratories supplied by the European Space Agency and Japan.
In the midst of all the activity, the two crews were able to take a few minutes out of their work to talk with former President George H.W. Bush as he and his wife Barbara visited the Johnson Space Center and Mission Control.
�We're so very proud of what you're doing,� he told the astronauts.
The next STS-120 status report will be issued Friday morning or earlier if events warrant.
|
|
CMS The Best Conveyancing solicitors conveyancing quotes throughout the UK
For any webhosting enquiries please email webmaster@aus-city.com
|
|
Forums60
Topics830,851
Posts865,646
Members2,960
| |
Most Online102,106 Jul 10th, 2026
|
|
|