|
|
|
0 members (),
1,753
guests, and
25
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
S |
M |
T |
W |
T |
F |
S |
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
|
29
|
30
|
|
|
|
|
|
|
There are no members with birthdays on this day. |
M 4.0 - 10 km WSW of Point MacKenzie, Alaska
• M 1.7 - 20 km ENE of Willow, Alaska
• Moderate mag. 4.2 earthquake - North Pacific Ocean, 63 km southwest of Chin...
• M 4.5 - 154 km WSW of Banda Aceh, Indonesia
• M 4.5 - 154 km WSW of Banda Aceh, Indonesia
• M 4.5 - 154 km WSW of Banda Aceh, Indonesia
|
#481349
Mon 26 Nov 2018 05:06:PM
|
Joined: Feb 2001
Posts: 800,656
Launch Director
|
|
Launch Director
Joined: Feb 2001
Posts: 800,656 |
Abstract: The Wide-Field Infrared Survey Telescope (WFIRST) is a NASA observatorydesigned to answer questions about dark energy and astrophysics, planned for alaunch in 2025 to orbit around the Sun-Earth L2 (SEL2) Libration Point. Due tothe instability of the SEL2 vicinity, WFIRST must perform station keeping maneuversto remain in orbit. This paper reviews different navigation solutions and SRP modelingtechniques that are being considered when planning these maneuvers. In this paper,we will describe st... Source: Orbital Maintenance for the Wide Fi...avigation Accuracies on Station Keeping.
David Cottle
UBB Owner & Administrator
|
|
CMS The Best Conveyancing solicitors conveyancing quotes throughout the UK
For any webhosting enquiries please email webmaster@aus-city.com
|
|
Forums60
Topics949,784
Posts984,581
Members2,960
| |
Most Online102,106 Jul 10th, 2026
|
|
|
|
|
|