|
0 members (),
262
guests, and
29
robots. |
Key:
Admin,
Global Mod,
Mod
|
S |
M |
T |
W |
T |
F |
S |
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
29
|
30
|
|
|
|
|
There are no members with birthdays on this day. |
#490946
Tue 19 Feb 2019 02:54:PM
|
Joined: Feb 2001
Posts: 381,903
Launch Director
|
OP
Launch Director
Joined: Feb 2001
Posts: 381,903 |
Abstract: As NASA’s Space Launch System (SLS) approaches first launch, the design has matured to a point where the manufacturing uncertainty has decreased now that many of the components of the launch vehicle have been manufactured and the flight engines have been successfully tested. Prior to this point, a method was required to qualify and capture the impact of the differences between simulation and reality, as well as any uncertainties in the SLS design. Two primary categories of uncertainty arise d... Source: The Implementation of Maximum Likelihood Estimation in Space Launch System Vehicle Design
|
|
CMS The Best Conveyancing solicitors conveyancing quotes throughout the UK
For any webhosting enquiries please email webmaster@aus-city.com
|
Forums60
Topics683,226
Posts717,834
Members2,957
|
Most Online3,142 Jan 16th, 2023
|
|
|
|
Copyright 1996 - 2023 by David Cottle. Designed by David Bate Jr. All Rights Reserved.
By using this forum, the user agrees not to transfer any data or technical information received under the agreement, to any other entity without the express approval of the AUS-CITY Forum Admins and/or authors of individual posts (Forum Admins and DoD/USSPACECOM for the analysis of satellite tracking data).
Two-line elements (TLE) and all other satellite data presented and distributed via this forum and e-mail lists of AUS-CITY are distributed with permission from DoD/USSTRATCOM.
Reprise Hosting
|
|