|
|
|
0 members (),
3,085
guests, and
29
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
S |
M |
T |
W |
T |
F |
S |
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
|
29
|
30
|
31
|
|
|
|
|
|
There are no members with birthdays on this day. |
#29126
Sat 29 Apr 2006 02:03:PM
|
Joined: Feb 2001
Posts: 3,536
Mission Commander
|
OP
Mission Commander
Joined: Feb 2001
Posts: 3,536 |
04.28.06<br /><br />Katherine Trinidad<br />Headquarters, Washington<br />(202) 358-7239<br /><br />Jessica Rye<br />Kennedy Space Center, Fla.<br />(321) 867-2468<br /><br />STATUS REPORT: S-042806<br /><br />NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT<br /><br />NASA's space shuttle fleet is housed and processed at Kennedy Space <br />Center, Fla. <br /><br />Mission: STS-121 - 18th International Space Station Flight (ULF1.1) - <br />Multi-Purpose Logistics Module <br />Vehicle: Discovery (OV-103) <br />Location: Orbiter Processing Facility Bay 3 <br />Launch Date: Launch Processing Window July 1-19, 2006 <br />Launch Pad: 39B <br />Crew: Lindsey, Kelly, Sellers, Fossum, Nowak, Wilson and Reiter <br />Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles <br /><br />Technicians continue closing out areas of Discovery before it is moved <br />to the Vehicle Assembly Building on May 12. The payload bay doors <br />were closed on Wednesday for the final time prior to flight.<br /><br />Last week, technicians removed the space shuttle main engine in <br />position No. 2 and replaced it with a new one. Engine leak checks <br />were successfully completed on Tuesday. Interface verification tests <br />were completed for sensors No. 1 and 2 on the new orbiter boom sensor <br />system. <br /><br />Mission: STS-115 - 19th International Space Station Flight (12A) - <br />P3/P4 Solar Arrays <br />Vehicle: Atlantis (OV-104) <br />Location: Orbiter Processing Facility Bay 1 <br />Launch Date: No earlier than Aug. 28, 2006 <br />Launch Pad: 39B <br />Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper <br />Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles <br /><br />Technicians are performing powered-up system testing on Atlantis for <br />its mission to the International Space Station. Technicians continue <br />installing tires on the shuttle's main landing gear. <br /><br />Work continues on the alignment of the manipulator positioning <br />mechanisms. The positioning mechanisms are the pedestals that hold <br />the orbiter boom sensor system in place in the payload bay while the <br />boom is not in use. Thermal protection system tile, blanket and gap <br />filler work is ongoing. <br /><br />Endeavour (OV-105)<br /><br />Powered-up system testing continues on Endeavour in Orbiter Processing <br />Facility Bay 2 following an extensive modification period. <br />Technicians completed ammonia system leak and functional testing on <br />Wednesday and Thursday. <br /><br />Technicians worked on external airlock fluid line connections late <br />last week and will begin leak checks today. <br /><br />External Tank<br /><br />In the Vehicle Assembly Building, final thermal protection system foam <br />application was completed last week on the aft end of the tank <br />following the change-out of the four liquid hydrogen engine cut-off <br />sensors. On Monday, crane operators lifted the tank from a horizontal <br />position on the transporter and placed it between the twin solid <br />rocket boosters already stacked in High Bay 3 of the Vehicle Assembly <br />Building. <br /><br />The Space Shuttle Program management decided Thursday to fly the <br />ice/frost ramps in their current configuration. The rationale for <br />doing so was based on several factors. The past ramp performance, <br />although not desirable, was acceptable. Proposed ramp design changes <br />could introduce more uncertainty instead of reducing the known risk. <br />New cameras will allow us better insight into the current ramps <br />performance which will help in the redesign effort. Flying the <br />current ice/frost ramps limits the design changes on the tank, which <br />has already undergone a significant redesign with the removal of the <br />protuberance air load (PAL) ramp. Shuttle engineers will have a <br />better environment to gather data by flying with only one aerodynamic <br />change to the tank. <br /><br />For previous space shuttle processing status reports on the Web, <br />visit:<br /><br /> http://www.nasa.gov/shuttle
|
|
CMS The Best Conveyancing solicitors conveyancing quotes throughout the UK
For any webhosting enquiries please email webmaster@aus-city.com
|
|
Entire Thread
|
NASA's Space Shuttle Processing Status Report: S-042806
|
VA3DBJ
|
Sat 29 Apr 2006 02:03:PM
|
|
Forums60
Topics765,864
Posts800,617
Members2,958
| |
Most Online17,963 Jan 15th, 2026
|
|
|
|
|
Copyright 1996 - 2026 by David Cottle. Designed by David Bate Jr. All Rights Reserved.
By using this forum, the user agrees not to transfer any data or technical information received under the agreement, to any other entity without the express approval of the AUS-CITY Forum Admins and/or authors of individual posts (Forum Admins and DoD/USSPACECOM for the analysis of satellite tracking data).
Two-line elements (TLE) and all other satellite data presented and distributed via this forum and e-mail lists of AUS-CITY are distributed with permission from DoD/USSTRATCOM.
Reprise Hosting
|
|