|
|
|
0 members (),
1,876
guests, and
23
robots. |
|
Key:
Admin,
Global Mod,
Mod
|
|
S |
M |
T |
W |
T |
F |
S |
|
1
|
2
|
3
|
4
|
5
|
6
|
7
|
|
8
|
9
|
10
|
11
|
12
|
13
|
14
|
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
|
22
|
23
|
24
|
25
|
26
|
27
|
28
|
|
There are no members with birthdays on this day. |
#522213
Wed 11 Sep 2019 01:54:PM
|
Joined: Feb 2001
Posts: 381,904
Launch Director
|
OP
Launch Director
Joined: Feb 2001
Posts: 381,904 |
Abstract: NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airline... Source: Fast-Time Simulation for Evaluating...ady Time Uncertainty on Surface Metering
|
|
CMS The Best Conveyancing solicitors conveyancing quotes throughout the UK
For any webhosting enquiries please email webmaster@aus-city.com
|
|
Forums60
Topics763,208
Posts797,944
Members2,958
| |
Most Online17,963 Jan 15th, 2026
|
|
|
|
|
Copyright 1996 - 2026 by David Cottle. Designed by David Bate Jr. All Rights Reserved.
By using this forum, the user agrees not to transfer any data or technical information received under the agreement, to any other entity without the express approval of the AUS-CITY Forum Admins and/or authors of individual posts (Forum Admins and DoD/USSPACECOM for the analysis of satellite tracking data).
Two-line elements (TLE) and all other satellite data presented and distributed via this forum and e-mail lists of AUS-CITY are distributed with permission from DoD/USSTRATCOM.
Reprise Hosting
|
|