Boeing CST-100 Crewed Flight Test (CFT): Today, the CFT crew spent time rebuilding the Pressure Control and Pump Assembly (PCPA) SN007 as practice before rebuilding the PCPA SN002 as a viable spare PCPA for the Urine Processor Assembly (UPA). Payloads: ExPRESS Rack-6 Laptop (ELC-6): The hard drive was swapped on ELC-6 as part of laptop …

Source: ISS Daily Summary Report - 6/27/2024