Mick thats no worry thay have relaced them to count but they are supposed to leave me 6 in hand, thats in the contract.<br />But the saga continues.,,,,I repeat like a parrot, like a parrot, like a parrot, because the trees cover the house in winter it takes time to dry the due on the roof, its normally dry by 10.30 to 11.00AM.<br />Now I repeated the day before that to arrive around 11.30AM so by 12 noon we can reseal the damaged areas (faulty Pointing cement)and give it around 1 HR to dry before putting the final coat on arond 1 to 1.15PM and it takes around 1Hr and 10 minutes to put the final coat on the total roof so that put the finish time around 2.10 to 2.25 PM now that would have been ok.<br />BUT they put the final coat at 2pm and finished at 3.10 pm that puts it DANGER time for the dew that arrives around 5PM<br />So what does all this crap mean? They FUCKED it again the last 6 rows of tiles that I can see on the ladder closest to the gutter (LAST PAINTED) one in 10 tiles has runs in it, but I cannot see higher up the roof as I don't wont to walk on it yet.<br />Now remember I told them to get here at noon and also rang them in the morning telling him NOT TO BE LATE BECAUSE OF THE DEW PROBLEM,,,,HELLO IS ANYBODY HOME<br />I studied on the net the manufacture of the coating and it tells you all the spec,s and I also rang them in South Australia.<br />Tell me all!!!!!!!! where is the problem here where is the problem !!!!!!!!.<br />Phil <img border="0" title="" alt="[Mad]" src="images/icons/default/mad.gif" /> <img border="0" title="" alt="[Mad]" src="images/icons/default/mad.gif" /> <img border="0" title="" alt="[Mad]" src="images/icons/default/mad.gif" />